THA00000037_Call from TWUL NST to TWUL NMC at 2.44am re DBV and hydrant pressure gauge.pdf [pdf]
Published on:
THA00000036_Call from TWUL NST to TWUL NMC at 2.30am re additional water into the DMA.pdf [pdf]
Published on:
THA00000035_Call from TWUL NMC to TWUL NST at 2.18am re LFB set up on hydrants.pdf [pdf]
Published on:
THA00000030_Senior Network Operator Log.pdf [pdf]
Published on:
THA00000028_Call Transcript from TWUL Field Operations Manager to TWUL Despatch at 6.43am.pdf [pdf]
Published on:
THA00000007_CFOA South East Region Memorandum of Understanding (MOU 2.1) - re_ the installation and repair of fire hydrants and the use of water for extinguishing fires.pdf [pdf]
… inform the Fire Authority of any changes to its charging schedule at least three calendar months prior to the change. … Inspection and Testing The Fire Authority will undertake scheduled inspection / dry testing / wet testing (delete as … inform the Fire Authority of any changes to its charging schedule at least three calendar months prior to the change. …
Published on:
THA00000006_National Guidance Document on the Provision of Water for Fire Fighting by the Local Government Association and Water UK [No.3].pdf [pdf]
… under subsection (5) above except-- (a) n accordance with Schedule 5 to this Act; and (b) on an application made in accordance with that Schedule by the Director or by the water undertaker in … maximum Sensitive Customers e.g. Dialysis patients. Valving schedules. Is the area pressure reduced and by what type of …
Published on:
MET00070433_Exhibit DXN_1.pdf [pdf]
Published on: