CCL00002035_Curtins document entitled Grenfell Tower Building Control Submission.pdf [pdf]
Published on:
01-27-08 Cam 5 (Nadia Jafari exits lift lobby and walks into main lobby) INQ00000427.pdf [pdf]
Published on:
CCL00001986_Letter from CAN with quotation for concrete structural testing on Grenfell Tower._0.pdf [pdf]
Published on:
CCL00001983_Grenfell Investigations (42186439-1).MSG Email concerning structural investigation_0.pdf [pdf]
Published on:
CCL00001982_Email between Gareth Jones (studio E) and Curtins regarding scope of structural survey._0.pdf [pdf]
Published on:
CCL00001925_Studio E, drawing entitled Proposed Walkway+1 Floor Plan, 1279-RE114 Rev 03.pdf [pdf]
Published on:
CCL00001924_Studio E, drawing entitled Proposed Walkway Plan, 1279-RE113 Rev 04.pdf [pdf]
Published on:
CCL00001923_Studio E, drawing entitled Proposed Mezzanine Floor Plans, 1279-RE112 Rev 04.pdf [pdf]
Published on:
CCL00001922_Studio E, drawing entitled Proposed Ground Floor Plan, 1279-RE111 Rev 04.pdf [pdf]
Published on:
CCL00001921_Studio E, drawing entitled Proposed Floor Plans, 1279-RE110 Rev 05.pdf [pdf]
Published on:
CCL00001920_Studio E, drawing entitled Proposed Deck Floor Plan, undated, no code.pdf [pdf]
Published on: