Skip to main content
Home
Accessibility Tool
  • Zoom in
  • Zoom out
  • Reset
  • Contrast
  • Accessibility help
Leave Site
Show — Main navigation Hide — Main navigation
  • Home
  • About
  • News
  • Documents
  • Evidence
  • Hearings
  • Venue
  • Contact
  • Support

Breadcrumb

  1. Home
  2. Evidence
  3. CEP Architectural Facades Limited exhibits

CEP Architectural Facades Limited exhibits

Date: 27 January 2020
> View this hearing
Witness: CEP Architectural Facades Limited
> View other evidence
Type: Document
> View more Document evidence
Previous CEP Architectural Facades Limited evidence
Next CEP Architectural Facades Limited evidence

Downloads

Download all files as a zip
  • CEP00048962_Email correspondence between Leadbitter, Alcoa & CEP attaching the outline specification & various technical drawings as to the refurbishment works at Grenfell Tower.pdf(771.38 KB)
  • CEP00049717_Email from Alcoa to CEP re BBC Report on ACM in UAE and the Supply of Reynobond in the UK.pdf(37.87 KB)

Share this page:

Previous CEP Architectural Facades Limited evidence
Next CEP Architectural Facades Limited evidence

Contact

Grenfell Tower Inquiry

Aldwych House

71-91 Aldwych, London

WC2B 4HN

contact@grenfelltowerinquiry.org.uk
0800 121 4282

Useful links

  • Accessibility
  • Cookies
  • Privacy
  • Terms and conditions

Follow us

© Crown copyright.  Licensed under the Open Government Licence v3.0 except where otherwise stated.