Date: 2 March 2020 > View this hearingWitness: Bruce Sounes> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip SEA00014273_2018.11.09 Witness Statement of Bruce Alexander Sounes (Studio E).pdf(2.83 MB) IDX0173.pdf(274.78 KB) SEA00000007_Email from TMO to Studio E regarding principal objectives of Grenfell Tower project, relationship with KALC project_1.pdf(1.03 MB) SEA00000018_Studio E - Grenfell Tower - Fee Proposal.pdf(10.4 MB) SEA00000020_Email chain between Evoxa and Studio E attaching fee proposal and giving Exova's comments on GT Stage C proposals.pdf(1.51 MB) SEA00000022_Email from Exova to Studio E attaching comments on GT Option D.pdf(369.32 KB) SEA00000023_Email chain between Appleyards, TMO, Studio E attaching Budget Cost Estimate nr. 1 and drawings, noting costs over budget.pdf(714.28 KB) SEA00000030_Email between Exova and Studio E attaching Ashton's fee proposal.pdf(753.28 KB) SEA00000035_Grenfell Tower - James Lee - leaving email.pdf(405.1 KB) SEA00000037_Correspondence between Studio E, Exova, TMO regarding smoke exhaust specification.pdf(1.02 MB) SEA00000038_Email from Cate Cooney at Exova to Bruce Sounes with queries re ventilation, riser, fire-fighting lift, fire doors.pdf(443.93 KB) SEA00000043_Email from Cate Cooney (Exova) to Bruce Soanes (Studio E) re new residential floors and impact on stair and escape provisions.pdf(710.28 KB) SEA00000045_Email from Sounes to Exova regarding progress of fire strategy for proposed GT design.pdf(324.31 KB) SEA00000046_Email from Max Fordham to RBKC Building Control attaching their interpretation of Part L of building regs and requesting comments.pdf(16.68 KB) SEA00000048_Email between Studio E and Exova attaching fire strategy and plans and need to meet to go through the same.pdf(29.03 KB) SEA00000054_Email chain between Studio E and Exova attaching fire strategy and plans and need to meet to go through the same.pdf(31.75 KB) SEA00000055_Email between Studio E and Exova attaching fire strategy and plans and need to meet to go through the same.pdf(43.06 KB) SEA00000058_Correspondence between Studio E, Exova and Max Fordham regarding progress of fire strategy for proposed Grenfell Tower design.pdf(717.96 KB) SEA00000059_Email chain between Studio E and TMO regarding specification for upgrade to alarm and smoke extract (Oct 11), LFB comments re Apr 2010 fire in GT which led to specification.pdf(1021.86 KB) SEA00000061_Fire Strategy cover email.pdf(481.45 KB) SEA00000064_Email re planning withdrawal and simultaneous resubmission.pdf(413.62 KB) SEA00000074_Email chain between Exova, Studio E, Appleyards, TMO, Leadbitter, Curtins regarding appointment of Exova.pdf(1013.36 KB) SEA00000078_Correspondence between Studio E, Leadbitter, Exova regarding fire-fighting access, dry rising main, whether there is need to change existing arrangements.pdf(980.17 KB) SEA00000095_RE_ Grenfell Tower - Fees.pdf(808.68 KB) SEA00000097_Meeting invite.pdf(13.73 KB) SEA00000099_Drawing of boxing club floor plan in email from Studio E to Exova..pdf(1.45 MB) SEA00000100_Email chain between Ashton and Sounes attaching annotated drawings of smoke ventilation system with fire safety requirements and fire ratings.pdf(2.18 MB) SEA00000101_Email chain between Max Fordham, Studio E, Exova regarding site visit, EMB drawing showing exit route, smoke vents_AOV specifications.pdf(968.61 KB) SEA00000102_Email chain between Sounes and Ashton regarding AOV and ventilation specifications, stair to EMB office, attaching drawing relating to the same.pdf(908.62 KB) SEA00000104_Email chain between Sounes and Ashton regarding AOV and ventilation specifications, stair to EMB office, attaching drawing relating to the same.pdf(869.9 KB) SEA00000108_Email chain between Studio E, Max Fordham, Exova regarding AOV and ventilation specifications, how to present the smoke control system to RBKC, protecting communal areas and escape.pdf(2.07 MB) SEA00000109_Email chain attaching draft fire strategy and access drawings, AOV changes.pdf(308.6 KB) SEA00000112_Email chain between TMO, Studio E, Artelia, Exova regarding possibility of keeping external staircase to save £100k.pdf(855.31 KB) SEA00000113_Email chain between TMO, Studio E, Artelia, Exova regarding possibility of keeping external staircase to save 100k, regulation and fire safety implications.pdf(1.19 MB) SEA00000114_Email chain between Sounes, Exova and others attaching in-progress drawings including nursery, offices, stairs, smoke ventilation.pdf(453.39 KB) SEA00000115_Email chain regarding revised office layout, comments on stair void, retention of existing escape stair, final exit route via entrance lobby.pdf(1.09 MB) SEA00000116_Email between Max Fordham and Exova regarding lift lobby smoke control, building regs requirements.pdf(493.71 KB) SEA00000121_Email from Sounes to RBKC attaching fire strategy, strategy drawings, proposal of upgrade to AOV.pdf(450.7 KB) SEA00000128_Grenfell Tower - OFSS.pdf(4.16 MB) SEA00000148_Email sending RBKC Building Control fire strategy and accompanying drawings, response saying information inadequate to show new AOV system not worse than old system.pdf(1.29 MB) SEA00000154_Email sending building control fire strategy and accompanying drawings, query re final exit route, clarification of the same.pdf(961.7 KB) SEA00000157_Email to RBKC attaching updated fire access plan.pdf(110.04 KB) SEA00000159_Email sending RBKC Building Control fire strategy, accompanying drawings, clarifications, RBKC response saying information inadequate to show new AOV system not worse than old syst.pdf(3.07 MB) SEA00000167_Grenfell Tower Significant Findings & Action Plan Nov 2012 (updated Dec 2012 & April 2013).doc.pdf(2.64 MB) SEA00000169_1279 Grenfell Tower Regeneration Project - National Building Specification (NBS) - Employer's Requirements Date_ 30 January 2014.pdf(145.03 MB) SEA00000170_Email chain regarding meeting with fire brigade, info on smoke ventilation system, attachment of fire strategy drawings (including building control mark ups), service risers openin.pdf(1.29 MB) SEA00000172_Email recording outcome of meeting with LFB, noting_ airflow calculations; smoke vents in wrong position; LFB access to block and water; lift types; signage; alarms; AOVs in finger.pdf(3.09 MB) SEA00000175_Grenfel Tower - Building Control Fees Email BS.pdf(190.85 KB) SEA00000186_Email from JS Wright to Building Control regarding modifications to dry riser.pdf(566.07 KB) SEA00000188_Email from JS Wright to Building Control regarding modifications to dry riser and response re building regulations.pdf(1.44 MB) SEA00000189_Grenfell Tower Project dry riser email between Rydon and John Hoban RBKC Building Control.pdf(531.13 KB) SEA00000214_Email to Ashton attaching revised fire strategy plans, comments in response giving approval, extension of smoke extract system serving lift lobbies, fire separation and fire doors.pdf(1.09 MB) SEA00000215_Email from Crawford to Hoban attaching drawings for GT project, including RBKC mark ups of fire strategy.pdf(783.11 KB) SEA00000348_site image.pdf(760.32 KB) SEA00000349_Photograph of Grenfell Tower pre-refurbishment.pdf(737.46 KB) SEA00000350_Photograph of Grenfell Tower pre-refurbishment.pdf(630.77 KB) SEA00000351_site image.pdf(297.44 KB) SEA00000352_site image.pdf(411.76 KB) SEA00000353_site image.pdf(337.69 KB) SEA00000354_site image.pdf(347.04 KB) SEA00000355_Site image during refurbishment.pdf(469.6 KB) SEA00000356_site image.pdf(532.12 KB) SEA00000357_site image.pdf(557.19 KB) SEA00000358_Site image.pdf(463.56 KB) SEA00000359_Site image.pdf(356.57 KB) SEA00000360_Site Image during renovations.pdf(450.72 KB) SEA00000361_Site image of tower post renovations.pdf(620.85 KB) SEA00000362_Site Image.pdf(1.01 MB) SEA00000363_Site image of Grenfell tower post renovation.pdf(508.5 KB) SEA00000364_Site image of Grenfell tower post renovations.pdf(739.71 KB) SEA00000365_site image post renovations.pdf(1.14 MB) SEA00000366_site image post renovations.pdf(777.72 KB) SEA00000367_site image post renovations.pdf(308.82 KB) SEA00000371_site image post renovations.pdf(793.53 KB) SEA00000512_COSHH Safety Data Sheet - RB.pdf(6.35 MB) SEA00000515_Alcoa Architectural Products Technical Bulletin regarding Reynobond - cleaning recommendation for Alcoa Architectural Products aluminium panels.pdf(1023.22 KB) SEA00000516_BBA certificate consisting of PRODUCT SHEET 1 — REYNOBOND ARCHITECTURE WALL CLADDING PANELS.pdf(5.1 MB) SEA00000517_Warranty SPECIMEN uk.pdf(863.83 KB) SEA00000858_Reynobond Colour Chart document regarding cladding panels.pdf(933.67 KB) SEA00000869_Reynobond_ColourChart_Effects-GB2011.pdf(1.67 MB) SEA00001009_Kinspan brochure entitled _Kooltherm-K15-Rainscreen-Board.pdf_ regarding INSULATION FOR RAINSCREEN CLADDING SYSTEMS to be installed on Grenfell Tower.pdf(4.54 MB) SEA00001042_Hunters, drawing entitled Ground and First Floors As Existing, AGr001..pdf(250.14 KB) SEA00001043_Hunters, drawing entitled Second and Third Floor As Existing, AGr002..pdf(226.2 KB) SEA00001044_Hunters, drawing entitled Ground and First Floors As Proposed, AGr001..pdf(323.8 KB) SEA00001045_Hunters, drawing entitled Second and Third Floor As Proposed, AGr004..pdf(291.4 KB) SEA00001068_Clifford Wearden + Associates, drawing entitled _Site Layout Plan at Deck Paving Finishes_, 0023.pdf(125.81 KB) SEA00001069_Clifford Wearden + Associates, drawing entitled _Core Plan D+3 to +11_, 2045B.pdf(111.45 KB) SEA00001070_Clifford Wearden + Associates, drawing entitled _Core Plan D+12 to +21_, 2046B.pdf(105.29 KB) SEA00001071_Clifford Wearden + Associates, drawing entitled _Deck +23 Roof Plan_, 2015A.pdf(118.85 KB) SEA00001072_Clifford Wearden + Associates, drawing entitled _Deck-2 Play Centre Lower Level Plan_, 2007B..pdf(140.06 KB) SEA00001073_Clifford Wearden + Associates, drawing entitled _Deck+0 Pedestrian Deck Level Plan_, 2009B.pdf(120.8 KB) SEA00001074_Clifford Wearden + Associates, drawing entitled _Section D-D Deck +18 to Deck +23_, 2019B (Preliminary).pdf(110.7 KB) SEA00001075_Clifford Wearden + Associates, drawing entitled _Tower Block and Adventure Playground Upper Levels_, 2002A, annotated.pdf(213.63 KB) SEA00001076_Clifford Wearden + Associates, drawing entitled _Deck +1 Group Medical Practice Plan_, 2010E.pdf(146.7 KB) SEA00001077_Clifford Wearden + Associates, drawing entitled _Deck +2 Dwelling Floor Plan_, 2011A.pdf(116.86 KB) SEA00001078_Clifford Wearden + Associates, drawing entitled _Deck +12 to +21 Dwelling Floor Plan_, 2013A.pdf(104.69 KB) SEA00001079_Clifford Wearden + Associates, drawing entitled _Core Plan D-2_, 2041.pdf(122.64 KB) SEA00001080_Clifford Wearden + Associates, drawing entitled _Deck +3 to +11 Dwelling Floor Plan_, 2012A.pdf(102.01 KB) SEA00001081_Clifford Wearden + Associates, drawing entitled _Section D-D Deck +18 to Deck +23_, 2019A.pdf(156.17 KB) SEA00001082_Clifford Wearden + Associates, drawing entitled _Site Layout Plan D-1 Paving Finishes_, 0022.pdf(104.18 KB) SEA00001252_Studio E, drawing entitled Existing Sections and Elevations, 12-009 SK003 Rev 00..pdf(637.31 KB) SEA00001283_Studio E, drawing entitled Proposed Plan, Elevation & Section Detail, 1279 SK 011b Rev 00..pdf(322.37 KB) SEA00001337_Cladding Mat 37.pdf(1.35 MB) SEA00001338_Kingspan document regarding insulation calculations provided in the context of the Grenfell Tower regeneration project.pdf(1.69 MB) SEA00001357_Studio E, drawings entitled Heating Options. SK 032..pdf(486.27 KB) SEA00001358_Studio E, drawing entitled Window Option 1. No code..pdf(516.73 KB) SEA00001359_Studio E, drawing entitled Window Options 2. No code..pdf(718.86 KB) SEA00001918_Studio E, drawing entitled Proposed North Elevation, 1279 RE305 Rev 02..pdf(347.9 KB) SEA00001987_82076-NZ-Datasheet-Composite.pdf(855.49 KB) SEA00002013_rheinzink_colorchart.jpg.pdf(215.41 KB) SEA00002067_Studio E Document Entitled _Proposed Cladding Materials_.pdf(2.5 MB) SEA00002077_Revised submission plans IBI to RBKC. Contains drawing register..pdf(52.5 KB) SEA00002093_Drawing Register, Studio E..pdf(1.07 MB) SEA00002104_Email correspondence from Senior Architectural and Studio E, discussing the method of fixing windows on Grenfell Tower..pdf(615.29 KB) SEA00002110_Email correspondence from Senior Architectural and Studio E, discussing the method of fixing windows on Grenfell Tower..pdf(245.58 KB) SEA00002155_Studio E, drawing entitled Proposed TYP Bay Plan & Elevation, 1279 (06)110 Rev 00..pdf(299.73 KB) SEA00002163_Studio E, drawing entitled Proposed TYP Bay Plan & Elevation, 1279 (06) 110 Rev 00..pdf(364.45 KB) SEA00002164_Email from Schueco UK Limited to Studio E, discussing the calculation of the u-value, static and section through for AWS75.SI_..pdf(750.7 KB) SEA00002275_Grenfell Tower Harley budget costs submitted for external cladding..pdf(303.58 KB) SEA00002330_Reynobond document, showing Colourchart for brushed cladding products..pdf(1.11 MB) SEA00002339_Unauthored, untitled drawing of Section A Ventilated Lobbies. No code..pdf(399.05 KB) SEA00002368_Curtins Consulting Document Entitled _Specification - Structural performance specification for the design, supply and application of overcladding systems to grenfell tower_.pdf(8.63 MB) SEA00002422_Wicona NBS Specification Issue 1, detailing tendering information for cladding and windows for Grenfell Tower..pdf(3.51 MB) SEA00002496_Studio E, drawing entitled Fire Access Plan, Employer's Requirements, 1279 (08) 100 Rev 00..pdf(621.92 KB) SEA00002497_Studio E, drawing entitled Fire Access Plan, Employer's Requirements, 1279 (08) 100 Rev 00..pdf(725.52 KB) SEA00002499_Studio E, drawing entitled Proposed Typical Bay Plans, Section & Elevation, Employer's Requirements, 1279 (06) 110 Rev 00..pdf(5.81 MB) SEA00002507_Studio E, drawing entitled Flat 91 Survey (1 Bed), 1279 (02) 030 Rev 00..pdf(342.86 KB) SEA00002556_Studio E, drawing entitled Section E, 1279 (06) 103 Rev 00, Employer's Requirements..pdf(354.92 KB) SEA00002557_Studio E, drawing entitled Section F, 1279 (06) 104 Rev 00.pdf(315.52 KB) SEA00002561_Studio E, drawing entitled Proposed Roof Plant Plan, Employer's Requirements, 1279 (04) 108 Rev 00..pdf(371.73 KB) SEA00002576_Studio E, drawing entitled Window Surrounds Making Good Typ Resi, Employer's Requirements, 1279 (05) 118 Rev 00..pdf(199.13 KB) SEA00002590_Studio E, drawing entitled Proposed Basement Plan, Employer's Requirements, 1279 (04) 100 Rev 00..pdf(168.34 KB) SEA00002591_Studio E, drawing entitled Proposed Walkway Plan, Employer's Requirements, 1279 (04) 103 Rev 00..pdf(354.42 KB) SEA00002593_Studio E, drawing entitled Proposed Roof Plan, Employer's Requirements, 1279 (04) 109 Rev 00..pdf(125.7 KB) SEA00002594_Studio E, drawing entitled Proposed Ground Floor Plan, Employer's Requirements, 1279 (04) 101 Rev 00..pdf(462.59 KB) SEA00002595_Studio E, drawing entitled Proposed Mezzanine Plan, Employer's Requirements, 1279 (04) 102 Rev 00..pdf(497.96 KB) SEA00002629_Studio E, drawing entitled Fire Access Plan, 1279 (08) 100 Rev 00, annotated.pdf(836.79 KB) SEA00002630_Studio E, drawing entitled Fire Access Plan, 1279 (08) 100.pdf(638.71 KB) SEA00002659_Studio E, drawing entitled Proposed Walkway+1 Plan, 1279 (04) 104 Rev 01.pdf(628.59 KB) SEA00002663_1279-SE LLP_ Drg Issue_ER 140130.pdf(1.49 MB) SEA00002686_Email Chain Between Alcoa, Harley, Rydon, Studio E re Rainscreen cladding categories, materials, colours, pricing, warranties,.pdf(617.62 KB) SEA00002730_Studio E, drawing entitled proposed mock up Plans, Section & Elevation, 1279SK101 Rev 00, annotated.pdf(59.92 KB) SEA00002736_Harley, drawing entitled Cladding Sample, Panel Positions and Colours. E3317 Mock Up..pdf(460.07 KB) SEA00003561_Photograph entitled _IMG_9180.JPG_.pdf(776.23 KB) SEA00003567_Correspondence between Studio E, KCTMO and RBKC regarding GT works in context of KALC works_2.pdf(1.3 MB) SEA00003573_Correspondence between Studio E, Curtins Consulting, Max Fordham and Churchman la regarding Grenfell Tower works in context of KALC works.pdf(377.04 KB) SEA00003591_Correspondence between Studio E, KCTMO and RBKC regarding GT works in context of KALC works.pdf(3.31 MB) SEA00003600_Photograph entitled _IMG00005-20120306-1635.jpg_.pdf(375.75 KB) SEA00003604_Photograph entitled _IMG00011-20120306-1651.jpg_ showing lift lobby.pdf(292.09 KB) SEA00003605_Photograph entitled _IMG00012-20120306-1651.jpg_.pdf(468.58 KB) SEA00003608_Photograph entitled “IMG00015-20120306-1654.jpg_.pdf(300.6 KB) SEA00003609_Photograph entitled “IMG00016-20120306-1654.jpg_ showing stairwell.pdf(358.21 KB) SEA00003634_Photograph entitled “IMG_5847.JPG_.pdf(590.54 KB) SEA00003896_Photograph entitled _IMG_5914-IMG_5916_3.tif_.pdf(258.05 KB) SEA00003910_Email attaching drawings for Grenfell Tower and JWA.pdf(309.32 KB) SEA00003941_Email attaching CEP Plans from another project for purpose of meeting re possible GT works.pdf(16.12 KB) SEA00003957_Email attaching sketches of layout proposals, fire escape strategies.pdf(376.82 KB) SEA00003962_Email chain re commissioning for GT project.pdf(513.24 KB) SEA00003965_Email chain between Studio E and CEP regarding photographs and sketches of GT from an initial walk about also attaching a picture of the area where GT is located.pdf(1.32 MB) SEA00004051_Correspondence between KCTMO and Studio E regarding planners meeting, including boundaries, aluminium cladding, boilers in relation to Grenfell Tower.pdf(621.01 KB) SEA00004053_Email regarding appointments and contracts, liability for fire design, fire strategy and safety advice_2.pdf(562.44 KB) SEA00004058_Correspondence between Studio E, KCTMO, Appleyards, Max Fordham, Churchmanla, Taylor Young, Curtins Consulting, Leadbitter and Exova attaching design team meeting notes, which inc.pdf(309.61 KB) SEA00004117_Correspondence between Studio E and Exova regarding scope of refurbishment works at Grenfell Tower and attaching drawings.pdf(502.28 KB) SEA00004136_Grenfell Tower Project.pdf(455.46 KB) SEA00004242_Email attaching drawings and exova fee and scope proposal.pdf(860.01 KB) SEA00004295_Minutes of Design Team Meeting on 24.05.12 regarding Grenfell Tower refurbishment works and in particular surveys and services to be provided from the different contractors.pdf(1.18 MB) SEA00004308_Grenfell Tower Access.pdf(308.69 KB) SEA00004312_Re_ Grenfell Tower Access.pdf(587.19 KB) SEA00004323_Email with Exova comments on fire escape option D, discussion of riser and smoke extraction system.pdf(1.02 MB) SEA00004327_Email attaching drawings from public consultation.pdf(355.01 KB) SEA00004328_Studio E, Design Sheet entitled Overcladding with drawings and photographs, undated, no code.pdf(660.58 KB) SEA00004329_Studio E, Design Sheet Entitled Low Level View, undated, no code.pdf(633.33 KB) SEA00004330_Studio E, Design Sheet Entitled Podium Changes, undated, no code.pdf(723.68 KB) SEA00004421_Correspondence between Studio E and KCTMO attaching design team meeting notes and project directory.pdf(276.39 KB) SEA00004433_Notes from a Grenfell Tower meeting relating to refurbishment works between TMO, the Director of Assets and Regeneration, the Lancaster West Area Manager and Studio E..pdf(32.99 KB) SEA00004434_resident attendance sheet mting 29th May.pdf(623.79 KB) SEA00004471_Email chain attaching Appleyards Budget Cost Estimate nr. 1, attaching drawings, discussion of building control fee.pdf(913.9 KB) SEA00004472_Email chain attaching Appleyards Budget Cost Estimate nr. 1, attaching drawings, discussion of building control fee.pdf(1.22 MB) SEA00004480_Email chain re Appleyards Budget Cost Estimate nr. 1, attachment of drawings, building control charges.pdf(1.21 MB) SEA00004536__FW_ Grenfell Tower, Max Fordham Fee Proposal_.pdf(1.15 MB) SEA00004542_Email attaching Exova scope and fee proposals.pdf(389.61 KB) SEA00004553_RIBA Amendments Document.pdf(49.4 KB) SEA00004561_Email attaching Studio E appointment and fee documents.pdf(281.77 KB) SEA00004572_Email re scope of exova appointment and fees.pdf(770.37 KB) SEA00004592_Email re fire strategy and access to GT.pdf(303.67 KB) SEA00004633_Email re scope of exova appointment and fees.pdf(1.23 MB) SEA00004638_Email re scope of exova appointment and fees.pdf(1.09 MB) SEA00004648_Studio E Notes_Minutes from Design Team Meeting 3 on 07.06.12.pdf(855.76 KB) SEA00004677_Correspondence between Studio E and Leadbitter regarding window options for Grenfell Tower.pdf(381.99 KB) SEA00004704_FW_ Grenfell Tower - Fee Acceptance Form.pdf(955.74 KB) SEA00004708_RE_ Grenfell Tower - Fee Acceptance Form.pdf(1.03 MB) SEA00004716__RE_ Grenfell Tower, Design Team Meeting_.pdf(1.09 MB) SEA00004737_Correspondence between Max Fordham and Studio E regarding cladding and acoustic vents, attaching drawing of the same.pdf(473.19 KB) SEA00004789_Email chain re exova advice, fire access requirements_1.pdf(635.31 KB) SEA00004790_Email chain re layout, areas where access required for fire appliance, dry risers embedded with drawing showing dry risers in lobby, undated, no code.pdf(1.31 MB) SEA00004801_Email chain re exova advice, fire access requirements.pdf(732.68 KB) SEA00004825_Correspondence within Studio E attaching project directory and drawings, meeting with planners, cladding preferences, window preferences in relation to the Grenfell Tower refurbish.pdf(447.44 KB) SEA00004854_Correspondence between Studio E and Appleyards regarding design meeting and window suppliers for Grenfell Tower.pdf(333.48 KB) SEA00004857_Studio E, Drawing Entitled Window Options 1, undated, no code.pdf(782.85 KB) SEA00004860_Email chain re percentage of facade accessible by fire tender, expansion of the same, dry fire mains, fire strategy.pdf(1.44 MB) SEA00004864_Minutes relating to Grenfell Tower refurbishment works involving TMO, Appleyards, Curtins Consulting, Max Fordham and Studio E..pdf(1.5 MB) SEA00004869_Correspondence between Studio E and Appleyards regarding design meeting and window suppliers for Grenfell Tower.pdf(863.86 KB) SEA00004896_Studio E, drawing Entitled Existing Floor Plans, 12-009SK001 Rev 01.pdf(39.92 KB) SEA00004921_Correspondence between Studio E and Sapa Group re windows, positions, free air calculations in relation to the Grenfell Tower.pdf(1.16 MB) SEA00004923_Grenfell tower heating options cost matrix.pdf(17.55 KB) SEA00004967_Correspondence between Studio E and Rockwool regarding cladding insulation queries, u-values, attaching drawings.pdf(476.22 KB) SEA00004970_6075 MW MA Grenfell Fee Proposal.pdf(626.22 KB) SEA00004973_Correspondence between Studio E and Max Fordham regarding insulation for Grenfell Tower.pdf(380.29 KB) SEA00004978_Correspondence between Studio E and Max Fordham regarding insulation spreadsheet, discussion of insulation, cladding and window discussion in relation to Grenfell Tower refurbishme.pdf(347.07 KB) SEA00004984_Correspondence between Studio E and Sapa Group regarding section details for windows, window positions, free air calculator spreadsheet in relation to Grenfell Tower refurbishment.pdf(774.04 KB) SEA00004986_Correspondence between Studio E and Max Fordham regarding insulation spreadsheet, discussion of insulation, cladding and window discussion in relation to Grenfell Tower refurbishme.pdf(1019.68 KB) SEA00005047_Correspondence between Studio E and Kawneer regarding window systems, free air, vents in relation to Grenfell Tower refurbishment works.pdf(689.61 KB) SEA00005063_Studio E Photograph Entitled “IMG_6883.JPG_ showing the system to open the windows (picture from inside the building).pdf(953.96 KB) SEA00005077_Correspondence between Taylor Young, RBKC and Studio E discussing floorspace, planning policy impacting insulation and acoustics in relation to Grenfell Tower.pdf(875.25 KB) SEA00005099_Grenfell Tower - BREEAM Domestic Refurbishment Email attaching information related to BREEAM domestic Refurbishment.pdf(16.14 KB) SEA00005107_Correspondence between Studio E and Leadbitter regarding meetings and requesting that the latter spend time on logistics, M&E and cladding for Grenfell Tower.pdf(377.33 KB) SEA00005129_Email Chain attaching tender docs, smoke extract info, specifications, document register.pdf(702.25 KB) SEA00005135_Email re manipulation of energy costs.pdf(292.95 KB) SEA00005143_Studio E, Drawing Entitled Proposed Floor Plans, undated, no code.pdf(512.09 KB) SEA00005145_RE_ Grenfell Tower appointments (discussing sub consultants).pdf(774.84 KB) SEA00005165_RE_ 301922 Grenfell Tower - James Lee.pdf(764.04 KB) SEA00005210_Correspondence between Studio E, KCTMO, Leadbitter, Max Fordham, KCTMO and Appleyards regarding window samples, attaching spreadsheet, canopy options in relation to the Grenfell To.pdf(490.06 KB) SEA00005254_Notes from Design Team Meeting No. 5 regarding Grenfell Tower Refurbishment works involving RBKC TMO, Leadbitter, Appleyards, Curtins Consulting, Max Fordham, Churchman Landscape A.pdf(1.98 MB) SEA00005269_Grenfell Tower Regeneration Project - Appointments.pdf(844.15 KB) SEA00005271_Correspondence between Studio e and Rockwool regarding recommended insulation of rainscreen duoslab in relation to Grenfell Tower refurbishment works.pdf(998.65 KB) SEA00005276_Correspondence between Studio e and Rockwool regarding recommended insulation of rainscreen duoslab in relation to Grenfell Tower refurbishment works.pdf(1.37 MB) SEA00005277_Email chain re appointment for fire strategy.pdf(379.53 KB) SEA00005297_Email chain with Max Fordham and Taylor Young concerning the BREEAM Domestic Refurbishment assessment.pdf(489.52 KB) SEA00005302_RE_ Grenfell Tower Regeneration Project - Appointments.pdf(519.4 KB) SEA00005319_pic's and plans.pdf(374.05 KB) SEA00005320_Correspondence between KCTMO and Studio E attaching heating drawings, window drawings, cladding drawings_pictures.pdf(301.84 KB) SEA00005330_Document sent from Studio E VMZ Composite Datasheet and showing Zinc panels option for Grenfell Tower.pdf(316.61 KB) SEA00005343__Grenfell Tower, Acceptance of Exova fees _.pdf(780.17 KB) SEA00005344_Email from Bruce Sounes attaching smoke exhaust specification.pdf(468.43 KB) SEA00005447_Grenfell - LPA position re major app and BREEAM.pdf(428.9 KB) SEA00005502_Grenfell Tower.pdf(16.21 KB) SEA00005507_Email chain regarding procurement appointments and terms and conditions.pdf(425.94 KB) SEA00005508_Correspondence between Studio E and Sapa Group regarding pivot windows for Grenfell Tower.pdf(384.97 KB) SEA00005509_Correspondence between Studio E and Sapa Group regarding pivot windows for Grenfell Tower.pdf(383.18 KB) SEA00005510_Correspondence between Studio E and Sapa Group regarding pivot windows for Grenfell Tower.pdf(445.18 KB) SEA00005523_RE_ Grenfell DTM.pdf(691.04 KB) SEA00005595_Email chain attaching smoke exhaust specification, fire strategy.pdf(1.47 MB) SEA00005597_Correspondence between Studio E, KCTMO, Taylor Young, Max Fordham discussing planning meeting with Edward George including zinc cladding, cladding joints, windows in relation to th.pdf(558.86 KB) SEA00005602_Taylor Young Minutes of LPA Pre-Application Meeting involving Studio E, Taylor Young and RBKC regarding windows, materials, base level, externals, walkway, EG, daylight in relation.pdf(573.31 KB) SEA00005606_Studio E Notes from Project Meeting NO. 5 involving RBKC, TMO, Leadbitter, Appleyards, Curtins Consulting, Max Fordham, Taylor Young Exova, Churchman Landscape Architects(CLA) and.pdf(1.8 MB) SEA00005651_Email re 2012 fire strategy including stair pressure_ventilation, risers, fire lift, fire doors.pdf(1.08 MB) SEA00005666_Unnamed drawing, undated, no code, provided by Studio E.pdf(170.82 KB) SEA00005686_Grenfell - contacts.pdf(303.02 KB) SEA00005688_Email from Paul Dunkerton (KCTMO) to Janice Wray (KCTMO and others re Exova's request for existing fire risk assessment.pdf(847.37 KB) SEA00005739__Grenfell Tower, BREEAM assessor appointment_.pdf(442.8 KB) SEA00005802_Grenfell Planning Deliverables Final Rev1_1.2.xlsx.pdf(237.94 KB) SEA00005818_Correspondence between Studio E and Max Fordham regarding request for CAD drawings, insulation calculations.pdf(486.96 KB) SEA00005840_Correspondence between Studio E and Max Fordham regarding Grenfell Tower - Insulation with particular reference to Celotex cladding panels, zinc panels, and ventilated cavity.pdf(277.92 KB) SEA00005841_Celotex Datasheet for Celotex FR5000 regarding cladding panels considered as option to be used for Grenfell Tower.pdf(1001.36 KB) SEA00005843_Correspondence between Max Fordham and Studio E regarding LPA Meeting feedback including vent detail, flat designs, canopy design, garages and windows louvres for Grenfell Tower em.pdf(463.11 KB) SEA00005848_Email attaching draft fire strategy.pdf(718.97 KB) SEA00006015_Document Extract entitled Grenfell Tower Design and Access Statement D+A regarding the site, the use, the landscape and sustainability in relation to Grenfell Tower refurbishment w.pdf(13.43 MB) SEA00006018_Email attaching first budget estimate and discussing building control fee.pdf(1.29 MB) SEA00006055_RE_ KALC_Grenfell Technical Review.pdf(948.93 KB) SEA00006059_Email regarding access requirements and risers.pdf(272.85 KB) SEA00006061_Email chain regarding access requirements and risers.pdf(371.66 KB) SEA00006065_Review.pdf(211.18 KB) SEA00006078_Correspondence between IBI Taylor Young, RBKC and Studio E regarding Application Validation for Grenfell Tower Regeneration Project_0.pdf(379.31 KB) SEA00006089_Artelia Grenfell Tower Budget Estimate Nr 3 (Stage C) Sep 12___0.pdf(225.04 KB) SEA00006095_Email re current alarm and smoke extract system_0.pdf(358.34 KB) SEA00006098_Correspondence between Studio E, Spapa Group and Leadbitter regarding preferred window design and attaching drawings in relation to the refurbishment works at Grenfell Tower_0.pdf(462.17 KB) SEA00006102_Correspondence between Studio E, Technal and Leadbitter regarding preferred window design and attaching drawings in relation to the refurbishment works at Grenfell Tower_0.pdf(483.18 KB) SEA00006112_Appleyards Grenfell Tower Budget Est nr. 3 (12 Sep 12).pdf(220.21 KB) SEA00006114_Email attaching Cost Plan nr. 3 rev 1 and discussing need to make savings and attaching outline fire strategy.pdf(1.6 MB) SEA00006116_Email attaching Cost Plan nr. 3 rev 1 and discussing need to make savings and attaching outline fire strategy.pdf(1.95 MB) SEA00006119_Email attaching Cost Plan nr. 3 rev 1 and discussing need to make savings and attaching outline fire strategy, riser relocation, change to access requirements.pdf(1.87 MB) SEA00006121_Correspondence between Appleyards, KCTMO, Studio E, Max Fordham, Curtins Consulting and Churchmanla attaching Cost Plan nr. 3 rev 1, discussing need to make savings, attaching outl.pdf(2.75 MB) SEA00006124_11833 Grenfell Tower Budget Estimate 3 Rev 2.pdf(224.9 KB) SEA00006125_Correspondence between Studio E and Umicore regarding plans for zinc cladding materials to be used in order to clad Grenfell Tower in the context of the regeneration project.pdf(375.15 KB) SEA00006126_Email chain regarding relocation of new staircase and lift, drawings attached.pdf(859.65 KB) SEA00006144_Curtins, drawing entitled Floor plate works, no code, annotated.pdf(618.9 KB) SEA00006155_Correspondence between Bruce Sounes at Studio E and Mark Anderson at KCTMO re further option for design, relocating the stair and keeping existing lift.pdf(336.93 KB) SEA00006157_Studio E Notes from Project Meeting 8 involving RBKC TMO, Leadbitter, Appleyards, Curtins Consulting, Max Fordham, Churchman Landscape Architects (CLA), Exova and Studio E regardin.pdf(1.79 MB) SEA00006161_Email attaching minutes from Project Meeting 8.pdf(1005.35 KB) SEA00006162_Correspondence within Studio E regarding need to discuss value engineering options with reference to Grenfell Tower refurbishment works.pdf(11.13 KB) SEA00006171_Appleyards Agenda of the Grenfell Tower Design Team Review Meeting to be held on Friday 21st September, 2012 embedding drawings of new GT floors, annotated by Curtins Consultng, no.pdf(14.51 MB) SEA00006178_Email re cost saving measures.pdf(595.58 KB) SEA00006227_11833 Grenfell Tower Regeneration Works - Fees.pdf(357.47 KB) SEA00006229_Correspondence between Studio E, Max Fordham, Appleyards, KCTMO, Syntegra regarding Grenfell Tower, Actions from BREEAM meeting (Friday 20th September).pdf(297.07 KB) SEA00006248_Kawneer, drawing entitled Typical Window Bay & Proposed Mock Up, PL_BP_12_00_03.pdf(13.46 KB) SEA00006251_Correspondence between Hydro and Studio E regarding change in window design for costs purposes in relation to Grenfell Tower refurbishment works.pdf(410.16 KB) SEA00006252_Correspondence between Studio E and Kawneer regarding window mock up and specifications in relation to the Grenfell Tower refurbishment works.pdf(861.85 KB) SEA00006253_Correspondence between Studio E and Kawneer regarding window mock up and specifications in relation to the Grenfell Tower refurbishment works.pdf(367.46 KB) SEA00006278_Grenfell Tower - Landscaping VE options.pdf(537.54 KB) SEA00006300_Email chain attaching elevations and detail drawings of cladding.pdf(2.1 MB) SEA00006317_Correspondence between Studio E and Appleyards attaching Stage C Report, programme and cost report in relation to Grenfell Tower regeneration Project.pdf(1023.23 KB) SEA00006318_Appleyards Riba Stage C Report for Grenfell Tower issued to RBKC - KCTMO regarding cost and risks of the project.pdf(1.94 MB) SEA00006319_Appleyards Budget Cost Plan nr. 4.pdf(223.14 KB) SEA00006332_Correspondence between Max Fordham and Studio E regarding LPA Meeting feedback including vent detail, flat designs, canopy design, garages and windows louvres for Grenfell Tower.pdf(17.85 KB) SEA00006344_Grenfell Tower.pdf(9.73 KB) SEA00006351_Email chain entitled_ Scope of works for upgrading the smoke extract system at Grenfell Towers.pdf(1.14 MB) SEA00006360_Correspondence between KCTMO, Studio E, Curitns Consulting, Max Fordham, Churchman regarding design decisions about Grenfell Tower refurbishment works.pdf(629.35 KB) SEA00006394_Email from Studio E to Max Fordham, Exova and Curtins Consulting regarding Grenfel Tower Work Packages spreadsheet and a discussion of design and work packages.pdf(408.11 KB) SEA00006429_Studio E, Grenfell Tower Regeneration Project Stage C Report regarding the architectural aspects of the Grenfell Tower regeneration project embedding drawings of the building, floo.pdf(66.7 MB) SEA00006440_Email re draft fire strategy, extract fans in bathroom and fire separation.pdf(825.65 KB) SEA00006443_Email attaching draft fire strategy.pdf(215.75 KB) SEA00006447_Studio E Notes from Project Meeting No. 10 involving RBKC TMO, Leadbitter, Appleyards, Curtins COnsulting, Max Fordham, Syntegra Consulting (SC), Studio E regarding Grenfell Tower.pdf(2.32 MB) SEA00006448_Studio E Notes from Project Meeting No. 9 involving RBKC TMO, Leadbitter, Appleyards, Curtins Consulting, Max Fordham, Churchman Landscape Architects (CLA), Syntegra, Exova, Jane S.pdf(2.18 MB) SEA00006493_Email re fire access complaint.pdf(531.6 KB) SEA00006498_Email chain re fire fighting access, dry rising main.pdf(959 KB) SEA00006502_Correspondence between Studio E and Appleyards regaridng comments on planning application in relation to Grenfell Tower and attaching note of meeting with planners.pdf(2.67 MB) SEA00006503_Correspondence between KCTMO, Studio E, Max Fordham and Churchmanla regarding note of meeting with planners in relation to Grenfell Tower refurbishment works.pdf(696.69 KB) SEA00006505_Email re meeting with building control, comments on smoke extraction system, risers, vents.pdf(525.04 KB) SEA00006526_Email from Adrian Jess at Studio E to Max Fordham, Appleyards and Leadbitter noting meeting with RBKC building control re fire strategy.pdf(1.86 MB) SEA00006533_Email regarding Grenfell AAP presentation.pdf(712.38 KB) SEA00006536_Email entitled _grenfell smoke supply_.pdf(306.53 KB) SEA00006543_Email re. Smoke Extract Update, embedded with drawing of smoke extract system, undated, no code.pdf(400.26 KB) SEA00006551_Email Chain Entitled _Facilities for the Disabled_ regarding fire escape strategy.pdf(253.14 KB) SEA00006552_Correspondence between Max Fordham And Studio E regarding Smoke Extract Fan Room at Grenfell Tower embedding drawing showing fans located in a separated room.pdf(234.15 KB) SEA00006652_Studio E, Drawing entitled Elevation Diagrams, undated, no code.pdf(275.25 KB) SEA00006660_Presentation entitled _Grenfell Tower Regeneration Project - AAP Presentation_.pdf(12.2 MB) SEA00006662_Email chain re parking spaces, ceiling heights.pdf(53.18 KB) SEA00006663_Email between Studio E and KCTMO attaching notes from meeting on external facade..pdf(970.59 KB) SEA00006666_Email re current drawings and Stage D report.pdf(465.86 KB) SEA00006671_Email re AAP meeting and comments on external facade.pdf(363.81 KB) SEA00006674_Email from Max Fordham to Studio E, regarding a discussion on outcome of Architects Appraisal Panel meeting and comments on external facade and window size..pdf(638.33 KB) SEA00006675_Studio E Notebook Extract, about various issues regarding design, concern about space around Grenfell Tower and nursery proposal..pdf(64.85 KB) SEA00006697_Grenfell Tower Planning Application progression meeting Minutes.pdf(556.03 KB) SEA00006705_Email re Revised Layouts, impact on fire strategy.pdf(927.16 KB) SEA00006707_Studio E spreadsheet regarding Grenfell Tower Regen Project RISK REGISTER.pdf(1.32 MB) SEA00006708_Email re Notes from project meeting.pdf(764.92 KB) SEA00006721_Studio E, drawing entitled Colour Options, 1279SK062 Rev 00..pdf(746.98 KB) SEA00006722_Studio E, drawing entitled Colour Options, 1279SK061 Rev 01..pdf(653.77 KB) SEA00006724_Grenfell Tower Planning Application progression meeting minutes.pdf(415.04 KB) SEA00006725_Email re access input.pdf(469.53 KB) SEA00006739_RE_ NOVEMBER FEES - HESTON - GRENFELL.pdf(14.52 KB) SEA00006742_Email re Revised Layouts and impact on fire strategy.pdf(1.74 MB) SEA00006807_Email re LPA comments on cladding colour options.pdf(463.09 KB) SEA00006818_Email re LPA comments on cladding colours and attaching work packages and drawing.pdf(854.96 KB) SEA00006942_Correspondence between Taylor Young and Studio E regarding Crown and colour options for Grenfell Tower.pdf(425.75 KB) SEA00006965_Email attaching drawings, verbal approval to give same to planners.pdf(306.83 KB) SEA00006972_Email attaching drawings, verbal approval to give same to planners.pdf(533 KB) SEA00006979_Email re cladding material.pdf(244.12 KB) SEA00006981_Email re cladding material.pdf(687.42 KB) SEA00006991_Email Chain re LPA queries re canopies, entrance security concerns, cladding colour, glass bridge.pdf(383.92 KB) SEA00006993_Correspondence between Adrian Jess at Studio E and Marc Watterson at Taylor Young re LPA queries re canopies, entrance security concerns, cladding colour, glass bridge.pdf(1.09 MB) SEA00006997_Correspondence between Adrian Jess at Studio E and Marc Watterson at Taylor Young re LPA queries re canopies, entrance security concerns, cladding colour, glass bridge.pdf(1.44 MB) SEA00007003_Correspondence between Alun Dawson at Appleyards and Marc Anderson at KCTMO re lower level layout, re-routing fire escape.pdf(29.2 KB) SEA00007007_Correspondence between Marc Watterson at Taylor Young and Paul Dunkerton at KCTMO re revised designs and LPA queries re canopies, entrance security concerns, cladding colour, glass.pdf(1.21 MB) SEA00007014_Email Chain re lower level layout_1.pdf(39.11 KB) SEA00007016_Correspondence between Mark Anderson at KCTMO and Studio E re revised designs and LPA queries re canopies, entrance security concerns, cladding colour, glass bridge,.pdf(1.63 MB) SEA00007018_Email attaching Leadbitter Buildability report.pdf(813.3 KB) SEA00007022_Email re concerns re Leadbitter build cost.pdf(19.25 KB) SEA00007036_Grenfell FRA.pdf(15.59 KB) SEA00007038_Email Chain re concerns re leadbitter build cost.pdf(25.87 KB) SEA00007041_Email attaching draft stage d fire strategy, report on existing extract system.pdf(493 KB) SEA00007046_Email attaching pre-Stage D drawings.pdf(839.31 KB) SEA00007058_Studio E Grenfell Tower Appointment Documents.pdf(488.07 KB) SEA00007062_Email Chain re draft stage D report_1.pdf(448.21 KB) SEA00007080_Notes from design review meeting between TMO and Studio E.pdf(61.32 KB) SEA00007092_Email chain re Leadbitter request for cost saving options.pdf(616.42 KB) SEA00007107_Grenfell Tower Regeneration Project - TMO Change of Personnel.pdf(526.33 KB) SEA00007114_Email re Studio E fees and cladding costs.pdf(508.21 KB) SEA00007121_Email re Leadbitter indications re appointments and costs.pdf(503.2 KB) SEA00007128_Email re Studio E fees and cladding costs.pdf(973.28 KB) SEA00007144_Email chain re fees and studio e being lead consultant.pdf(786.12 KB) SEA00007165_Grenfell - Feedback from Planners.pdf(276.81 KB) SEA00007166_RE_ Grenfell - Feedback from Planners.pdf(411.93 KB) SEA00007167_Email chain providing link to Stage D report (draft), use of EPS insulation with rainscreen cladding.pdf(834.41 KB) SEA00007169_Email attaching draft deed of appointment for Studio E.pdf(469.34 KB) SEA00007179_Email chain re draft deed of appointment for Studio E, novation.pdf(1004.94 KB) SEA00007183_Email chain re draft deed of appointment for Studio E, novation.pdf(1.49 MB) SEA00007214_Grenfell - Fees.pdf(183.17 KB) SEA00007220_Email chain re draft deed of appointment for Studio E, novation.pdf(1.61 MB) SEA00007223_Email re Studio E fees and cladding costs, studio e to act as lead consultant.pdf(1.15 MB) SEA00007228_Email chain regarding outstanding fees and appointments.pdf(1.84 MB) SEA00007266_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E regarding Jonathan Bore's choice of colours and materials.pdf(491.56 KB) SEA00007275_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E regarding choice of colours and materials for cladding.pdf(790.67 KB) SEA00007298_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E, Maddison regarding choice of colours and materials for cladding possible 300k saving changing zin.pdf(1.29 MB) SEA00007301_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E, Maddison regarding choice of colours and materials for cladding possible 300k saving changing zin.pdf(1.81 MB) SEA00007315_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E, Maddison, Kuszell regarding choice of colours and materials for cladding possible 300k saving cha_1.pdf(1.81 MB) SEA00007316_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E, Maddison regarding choice of colours and materials for cladding possible 300k saving changing zin.pdf(2.14 MB) SEA00007317_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E, Maddison, Kuszell regarding choice of colours and materials for cladding possible 300k saving cha.pdf(2.51 MB) SEA00007318_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E, Maddison, Kuszell regarding choice of colours and materials for cladding possible 300k saving cha.pdf(4.15 MB) SEA00007327_Grenfell Tower - Fees.pdf(348.04 KB) SEA00007331_Email Chain Between Sounes, Craig, George, Watterson, Dunkerton, Dawson, Studio E, Maddison regarding choice of colours and materials for cladding possible 300k saving changing zin.pdf(2.19 MB) SEA00007352_RE_ Grenfell Tower - Construction Stage Fees.pdf(464.7 KB) SEA00007368_Grenfell.pdf(15.08 KB) SEA00007372_Grenfell Tower Refurbishment Project - Studio E appointment.pdf(196.3 KB) SEA00007411_Invoice Grenfell.pdf(210.55 KB) SEA00007413_Email from Dawson to Sounes, Cagney, Jess, Hale, Lim, Dunkerton, Maddison regarding discrepancies in budget, particularly on external facade.pdf(519.03 KB) SEA00007414_Email chain between Appleyards and Studio E regarding budget costs estimate issues in respect of facade, and general fit out. Studio E providing proposals for savings..pdf(972.91 KB) SEA00007415_Email chain between Appleyards and Studio E regarding budget costs estimate issues in respect of facade, and general fit out. Appleyards' response to Studio E proposals. Attaching.pdf(1.42 MB) SEA00007420_Correspondence between Studio E, Appleyards, Max Fordham and KCTMO regarding costs of project, proposal to switch to combi boilers to lower costs and Value Engineering regarding Gr.pdf(1.48 MB) SEA00007440_Email chain between Appleyards and Studio E regarding budget costs estimate issues in respect of facade, and general fit out. Appleyards' chasing Studio E for proposals prior to me.pdf(1.47 MB) SEA00007442_Email Chain between Dawson, Sounes, Cagney, Jess, Hale, Lim, Dunkerton, Maddison, Palmer, Strazzullo, McQuatt, Studio E regarding discrepancies in budget, particularly on external.pdf(2.3 MB) SEA00007445_RE_ Grenfell Tower - Construction Stage Fees.pdf(910.26 KB) SEA00007446_Email from Cagney to Heston (Studio E) attaching information on zinc cladding.pdf(526.4 KB) SEA00007448_Email from Cagney to Heston (Studio E) attaching information on flat panel, traypanel, Sika panels.pdf(604.84 KB) SEA00007485_Email Chain Between Dawson, McQuatt, Smith, Palmer, Lim, Hale, Dunkerton, Maddison, Jess, Sounes, Watts regarding alternative options for lowering costs, particularly heating syste.pdf(2.05 MB) SEA00007489_Email Chain between Dawson, Sounes, Cagney, Jess, Hale, Lim, Dunkerton, Maddison, Palmer, Strazzullo, McQuatt, Studio E, Gibson, Powell, Cash regarding discrepancies in budget, par.pdf(3.18 MB) SEA00007492_FW_ Grenfell Tower Regeneration Project - BREEAM Value Engineering attaching a BREEAM pre-estimation report.pdf(1.6 MB) SEA00007494_RE_ Grenfell Tower Regeneration Project - BREEAM Value Engineering.pdf(1.98 MB) SEA00007496_RE_ Grenfell Tower Regeneration Project - BREEAM Value Engineering.pdf(2.55 MB) SEA00007506_Studio E, Powerpoint Entitled _Grenfell Tower Value Engineering Options March 2013_ showing plans of refurbishment, option of retaining existing fire escape stair, embedding drawin.pdf(2.44 MB) SEA00007518__RE_ Grenfell Tower, Curtins Invoice_.pdf(666.58 KB) SEA00007527_1279 - Grenfell Tower.pdf(364.29 KB) SEA00007531_Grenfell.pdf(240.46 KB) SEA00007532_Re_ Grenfell.pdf(471.13 KB) SEA00007557_FW_ Invoice Grenfell.pdf(815.47 KB) SEA00007563_Email from Bruce Sounes at Studio E to Peter Maddison at KCTMO regarding discussions on site and samples of alternative cladding.pdf(1012.04 KB) SEA00007568_Samples.jpg.pdf(314.95 KB) SEA00007578_Email Chain Between Powell, Sounes, Kuszell, Crawford regarding report for Paul Dunkerton on current project plans and opportunity to reduce costs, that value engineering will impa.pdf(933.23 KB) SEA00007579_Email Chain Between Powell, Sounes, Watterson, Palmer, McQuatt regarding report for Paul Dunkerton on current project plans and opportunity to reduce costs, that value engineering.pdf(1.33 MB) SEA00007580_Email Chain Between Powell and Sounes on current project plans and opportunity to reduce costs, possible change to aluminium cladding.pdf(2.05 MB) SEA00007588_E-mail from Sounes to Watterson and Studio E with cladding option links attached.pdf(307.73 KB) SEA00007589_E-mail from Sounes to Watterson and Studio E with cladding option links attached.pdf(353.35 KB) SEA00007591_Email Chain Between Powell, Sounes, Watterson, Palmer, McQuatt regarding report for Paul Dunkerton on current project plans and opportunity to reduce costs, that value engineering.pdf(2.1 MB) SEA00007598_RE_ 1279 - Grenfell Tower.pdf(1005.79 KB) SEA00007602_Email from Sounes to Tisbury, Heston (Studio E) regarding request for pricing of different cladding options and attaching elevation drawing.pdf(922.98 KB) SEA00007603_Email from Harley to Studio E expressing interest in undertaking overcladding scheme refurbishment. Following contact from CGL. Attaching selection of tower block project informati.pdf(343.55 KB) SEA00007604_Castlemaine.pdf(664.43 KB) SEA00007605_Chalcot.pdf(557.25 KB) SEA00007606_Clements.pdf(552.53 KB) SEA00007608_Email from Kent-Jackson to Sounes expressing interest in cladding work.pdf(234.21 KB) SEA00007617_Grenfell Tower Action Plan.pdf(676.24 KB) SEA00007618_RE_ Grenfell Tower Action Plan.pdf(1.12 MB) SEA00007625__Grenfell Tower Regen Project, Design Team Meeting_.pdf(521.76 KB) SEA00007627_Meeting Minutes from RBKC_TMO Design Meeting regarding difference between cost estimates, options for cost savings including heating system, kitchens, and bathrooms.pdf(298.63 KB) SEA00007638_Emails from Appleyards to Max Fordham, IBI and Leadbitter attaching documents for a project review meeting, including revised brief for the tower and revised action plan.pdf(433.87 KB) SEA00007639_Appleyards Document Entitled _Grenfell Tower Refurbishment - Draft Revised Brief at May 2013_.pdf(2.29 MB) SEA00007641_Appleyards Document Entitled _Grenfell Tower Refurbishment VE and Project Review Meeting_ setting out agenda for the meeting to be held on 9th May 2013.pdf(252.09 KB) SEA00007642_Hard copy extract 032.pdf(68.5 KB) SEA00007647_Email from Cagney to Dunkerton and Studio E attaching floor plan drawings.pdf(867.43 KB) SEA00007649_Email Chain Between George (RBKC), Watterson, Powell, McQuatt, Ashton, Gibson, Sounes, Dunkerton, Booth containing George's advice that insulated render not appropriate on tower be.pdf(568.4 KB) SEA00007651_Email from Booth to Dunkerton, McQuatt, Watterson, Maddison, Ashton, Palmer, Sounes, Thomas, Gibson, Kotecha, Hale, Powell, Lim, Cash attaching documents showing possible changes t.pdf(453.02 KB) SEA00007652_Minutes of meeting re_ Grenfell Tower Refurbishment, VE and Project Review held between Appleyards, KCTMO, Studio E, IBI Group, Leadbitter, Curtins and Max Fordham on 8 May 2013.pdf(717.29 KB) SEA00007654_Email from Booth to Dunkerton, McQuatt, Watterson, Maddison, Ashton, Palmer, Sounes, Thomas, Gibson, Kotecha, Hale, Powell, Lim, Cash attaching documents showing possible changes t.pdf(1.04 MB) SEA00007659_Email Chain Between Booth, Dunkerton, McQuatt, Watterson, Maddison, Ashton, Palmer, Sounes, Thomas, Gibson, Kotecha, Hale, Powell, Lim, Cash attaching documents showing possible ch.pdf(1.51 MB) SEA00007672_Internal email (Appleyards) cc IBI and Studio E regarding outcome of meeting with TMO 21.05.2013 regarding scope of work and budgeting. Intention is to continue with original plann_1.pdf(636.1 KB) SEA00007689_Re_ Grenfell Tower Regeneration Project - Revised Fee Calc.pdf(74.47 KB) SEA00007714_RE_ Studio E's fee's for Grenfell Tower.pdf(684.82 KB) SEA00007715_Email from Paul Dunkerton to Bruce Sounes explaining power surges, fire risk during surges, postponing works to north staircase.pdf(1.14 MB) SEA00007716_RE_ Studio E's fee's for Grenfell Tower.pdf(579.97 KB) SEA00007721_Correspondence between Appleyards and Studio E attaching revised brief for Grenfell Tower project.pdf(226.02 KB) SEA00007722_Appleyards Document Entitled _Grenfell Tower Refurbishment - Draft Revised Brief at June 2013_.pdf(2.9 MB) SEA00007757_Email Chain Between Starling, Sounes, Kuszell, Ostapiszyn, McGinness, Alabed regarding demolition of external staircase_1.pdf(522.13 KB) SEA00007758_Email chain regarding fire escape stair demolition, public concerns regarding the same, removal being part of the planning application_1.pdf(1.2 MB) SEA00007759_Email Chain Between Starling, Sounes, Kuszell, Ostapiszyn, McGinness, Alabed, Dunkerton, Maddison regarding demolition of external staircase and whether it is a fire escape_1.pdf(820.44 KB) SEA00007760_IMG_5874.JPG.pdf(772.61 KB) SEA00007766_Email from Bruce Sounes at Studio E to Peter Maddison at KCTMO and Dunkerton, Cagney, Watterson, Booth regarding different entrance options and lift options.pdf(421.75 KB) SEA00007771_Correspondence from Bruce Sounes at Studio E to Robert Powell at Appleyards and Booth, Maddison, Dunkerton attaching options for new lift and stairs.pdf(358.75 KB) SEA00007777_Correspondence between Studio E and KCTMO discussing options for new lift and stairs at grenfell Tower and embedding the relevant drawing.pdf(1.2 MB) SEA00007786_Email Chain Between Sounes, Maddison, Powell, Booth, Dunkerton, Watterson, Cagney discussing planners' mention of bronze, coper or enamelled steel and other options including aluco.pdf(517.78 KB) SEA00007796_Minutes from Grenfell Tower Town Planning Meeting on 24 June 2013 between RBKC LPA, Appleyards, KCTMO, Studio E and IBI regarding status of planning application being on hold, diff.pdf(87.02 KB) SEA00007803_Email from Sounes to Maddison, Gibson, Dunkerton, Booth, Cagney, Strazzullo, Smith, Watterson attaching new plan for office and stair arrangements.pdf(469.88 KB) SEA00007808_Grenfell Tower Regeneration Project - Fee proposal.pdf(313.32 KB) SEA00007817_Email chain between Studio E, IBI and Appleyards cc TMO regarding preference for middle height crown, monochrome colour scheme, access options and fire access strategy..pdf(877.14 KB) SEA00007822_RE_ Power point presentation of designs.pdf(722.04 KB) SEA00007836_Email from Studio E to TMO, Max Fordham, Appleyards, Curtins and IBI attaching link to upgraded drawings and noting Cllr Fielding-Mellen's involvement in cladding material proposed.pdf(939.08 KB) SEA00007858_RE_ Grenfell plans.pdf(463.47 KB) SEA00007866_Grenfell Tower - ongoing work & invoice.pdf(313.07 KB) SEA00007867_FW_ Grenfell Tower Regeneration Project - Fee proposal.pdf(631.59 KB) SEA00007880_RE_ Grenfell Tower Regeneration Project - Fee proposal.pdf(847.94 KB) SEA00007891_Grenfell.pdf(13.31 KB) SEA00007902_RE_ Grenfell Tower additional invoice.pdf(1022.09 KB) SEA00007903_130806 Grenfell Studio E Fee.pdf(386.94 KB) SEA00007906_Studio E Document Entitled _Appendix_B-Services.pdf_ forming part of the overall agreement between TMO and Studio E.pdf(635.23 KB) SEA00007910_Studio E Architects Limited document entitled _Memorandum of Agreement for the Appointment of An Architect_ between TMO and Studio E.pdf(1.27 MB) SEA00007912_Document Entitled _Appendix_A-Project_Data.rtf_ forming part of agreement between TMO and Studio E in relation to GT project.pdf(853.47 KB) SEA00007913_Document Entitled _Appendix_C-Fee Schedule.rtf_ forming part of agreement between TMO and Studio E in relation to GT project.pdf(654.81 KB) SEA00007914_Document Entitled _Appendix_D-Project_Brief.docx_ forming part of agreement between TMO and Studio E in relation to GT project.pdf(396.02 KB) SEA00007921_Email from Booth to Unknown Recipients Attaching Cost Plans and Draft Agenda for Design Meeting.pdf(320.33 KB) SEA00007927_Email from Sounes to Kulidzan, Booth, Gibson, Studio E attaching link to full set of grenfell drawings.pdf(345.85 KB) SEA00007973_Email from Glennon to Alison C (Senior Architectural) attaching drawings of bays and window types and requesting information on window types, fixing, glass.pdf(419.89 KB) SEA00008021_Studio E. 1279PL001 Rev 001; 1279PL002 Rev 00; 1279PL003 Rev 01; 1279PL010 Rev 00; 1279PL006 Rev 00; 1279PL008 Rev 00; 1279PL110 Rev 01; 1279PL111 Rev 01; 1279PL112 Rev 01; 1279PL1.pdf(15.14 MB) SEA00008036_Email from Sounes to Smith and Campbell regarding power surges, investigations, potential fire hazard, responses, temporary suspension of demolition work on the north staircase.pdf(31.19 KB) SEA00008050_Studio E. 1279PL001 Rev 00. 1279PL002 Rev 00. 1279PL010 Rev 00. 1279PL030 Rev 00. 1279PL020 Rev 00, annotated..pdf(4.36 MB) SEA00008052_Email from Sounes to Booth, Maddison, Gibson, Kulidzan, Campbell, Smith, Strazzullo, Ashton, Lim attaching Stage D report including fire safety report, BREEAM assessment and cost e_1.pdf(441.98 KB) SEA00008054_Studio E Document Entitled _Grenfell Tower Regeneration Project Stage D Report August 2013_, embedding drawings of Walking Routes, Lancaster West, Design Approach Podium, Proposed.pdf(40.31 MB) SEA00008055_Re_ Grenfell Tower.pdf(1.93 MB) SEA00008056_130820 FP2697 rev 01.pdf David Bonnett Associates Fee proposal for inclusive access consultancy services revision 01.pdf(2.05 MB) SEA00008057_Studio E, untitled drawing of the KALC Aerial 02, uncoded..pdf(344.36 KB) SEA00008147_RE_ Grenfell Tower additional invoice.pdf(1.01 MB) SEA00008177_Email Chain Between Kulidzan, Vontersch, Peters, Von Tersch, Sounes regarding planned works to Grenfell Tower and possible funding.pdf(2.7 MB) SEA00008300_RE_ Design Review Meeting - M&E focus.pdf(3.05 MB) SEA00008318_Re_ Fwd_ refurbish void flat 145 Grenfell Tower.pdf(1.01 MB) SEA00008325_Email from Smith to Booth, Gibson, Maddison, Kulidzan, Sounes, Strazzullo, Campbell, Cash, Lim attaching_ design meeting agenda; proposals, queries and discussion points; schedule.pdf(16.16 KB) SEA00008327_Max Fordham Document Entitled _Grenfell Tower - Proposals, Queries, Discussion Points.pdf_.pdf(115.19 KB) SEA00008328_Max Fordham Document Entitled _Schedule of M&E Surveys_.pdf(439.25 KB) SEA00008329_Email from Sounes to Campbell, Smith, Strazzullo, Ashton, Studio E, Gibson, Kulidzan attaching basement survey drawing.pdf(244.39 KB) SEA00008351_Email Chain Between Sounes, Campbell, Smith, Strazzullo, Ashton, Studio E, Gibson, Kulidzan attaching basement survey drawing and comments on the same.pdf(67 KB) SEA00008373_FW_ Building control for Grenfell tower project.pdf(984.01 KB) SEA00008374_RE_ Grenfell Tower & Heston Leisure Centre.pdf(519.27 KB) SEA00008375_RE_ Cladding Scheme - Grenfell Tower.pdf(619.23 KB) SEA00008377_RE_ Grenfell Tower & Heston Leisure Centre.pdf(735.81 KB) SEA00008382_RE_ Cladding Scheme - Grenfell Tower.pdf(1021.55 KB) SEA00008385_Email from Sounes to Strazzullo, Ashton, Studio E attaching mezzanine drawing and making comments on the same.pdf(422.91 KB) SEA00008394_FW_ Grenfell Tower - additional consultants..pdf(286.17 KB) SEA00008399_RE_ Grenfell Tower Regeneration Project.pdf(448.09 KB) SEA00008409_Email from Smith to Strazzullo, Ashton, Sounes, Campbell regarding alternative riser position, embedding a drawing of a Floor Plan, uncoded, annotated..pdf(535.13 KB) SEA00008411_Email Chain Between Smith, Strazzullo, Ashton, Sounes, Campbell, Studio E regarding alternative riser position, embedding drawings of Walkway +1 and a Floor Plan, uncoded, annotate.pdf(936.66 KB) SEA00008431_Email from Williams to Smith, Booth, Sounes attaching electrical certificates.pdf(415.97 KB) SEA00008465_Email Chain Between Sounes, Strazzullo, Ashton, Studio E regarding drawing of mezzanine.pdf(750.31 KB) SEA00008473_Email from Glennon to Williams and Studio E attaching photographs of tower base.pdf(245.39 KB) SEA00008477_Email from Glennon to Williams and Studio E attaching entrancce drawings.pdf(219.9 KB) SEA00008493_Email Chain Between Smith, Strazzullo, Ashton, Sounes, Campbell, Studio E regarding alternative riser position, embedding drawings of Floor Plans and Walkway +1, uncoded, annotated.pdf(1.55 MB) SEA00008501_Email Chain Between Smith, Strazzullo, Ashton, Sounes, Campbell, Studio E regarding alternative riser position, embedding drawings of Floor Plans and Walkway +1, uncoded, annotated.pdf(1.64 MB) SEA00008509_RE_ Grenfell Site Visit.pdf(1.2 MB) SEA00008510_Email Chain Between Ashton, Sounes, Studio E, Smith attaching marked up copies with fire safety comments, embedding a drawing of the Boxing Club and Office Floor Plan, uncoded, ann.pdf(1.02 MB) SEA00008511_Email Chain Between Smith, Strazzullo, Ashton, Sounes, Campbell, Studio E regarding alternative riser position, embedding drawings of the potential New Riser Position, Floor Plans.pdf(1.7 MB) SEA00008564_Email Chain Between Booth, Williams, Gibson, Maddison, Sounes, Smith, Strazzullo, Ashton, Campbell, Blythe, Lim, Cash attaching_ agenda for 24.09.12; minutes from previous meeting;.pdf(932.59 KB) SEA00008568_Spreadsheet Entitled _Project Risk Register_.pdf(1.1 MB) SEA00008572_Email Chain Between Ashton, Sounes, Studio E, Smith attaching marked up copies of stair placement drawing with fire safety comments and attaching hand drawings of stair options, em.pdf(1.69 MB) SEA00008581_Email Chain Between Blythe, Booth, Williams, Gibson, Maddison, Sounes, Smith, Strazzullo, Ashton, Campbell, Lim, Cash regarding asbestos reports, m&e design review paper, m&e surve.pdf(1.8 MB) SEA00008638_RE_ Grenfell - Planning Update.pdf(2.17 MB) SEA00008641_Email from Glennon to Sounes and Studio E attaching stair option drawings.pdf(238.69 KB) SEA00008644_Email from Rek to Cousins (Sig Roofing), Glennon, Sounes regarding titanium zinc cladding and request for products, drawing attached.pdf(491.36 KB) SEA00008664_Email from Glennon to Graham (Paneltec) and Studio E attaching elevation drawings.pdf(342.42 KB) SEA00008683_Email Chain Between Glennon, Paneltec, Rek, Studio E attaching elevation plans.pdf(366.14 KB) SEA00008686_Email Chain Between Smith, Sounes, Ashton, Campbell, Strazzullo, Studio E regarding site visit, exit route for the boxing club, smoke vent serving lift lobby.pdf(686.64 KB) SEA00008692_Email Chain between Between Rek, Harris, Sounes, Studio E attaching elevation drawings, cladding design intent, wind load calculations, engineer's report with targeted U values.pdf(906.17 KB) SEA00008703_Email Chain Between Rek, Cousins (Sig Roofing), Glennon, Sounes regarding titanium zinc cladding and request for samples, drawing attached.pdf(888.22 KB) SEA00008713_Re_ Grenfell Tower.pdf(925.47 KB) SEA00008718_Email Chain Between Sounes, Graham (Paneltec), Studio E regarding method of fixing for cladding.pdf(226.3 KB) SEA00008790_Email Chain Between Sounes, Booth, Maddison, Gibson, Williams, Studio E, Lim, Smith, Campbell regarding meeting with Harley in relation to the curtain wall, estimates for the same,.pdf(639.42 KB) SEA00008803_Email Chain Between Glennon, Sheaf, Snowdon, Rek, Sounes regarding elevation drawings, windows, integrated vent, u-value, kitchen extract, embedding drawings of Window Vents..pdf(1.05 MB) SEA00008805_Email Chain Between Rek, Smith, Sounes, Glennon regarding kitchen extract fans.pdf(683.1 KB) SEA00008806_Email Chain Between Rek, Cousins (Sig Roofing), Glennon, Sounes regarding titanium zinc cladding and request for samples, drawing attached, fixing system.pdf(1.18 MB) SEA00008809_Email Chain Between Harris, Sounes, Bailey, Rek regarding Harley's quotation and choice of cladding.pdf(1.28 MB) SEA00008811_Email Chain Between Harris, Sounes, Bailey, Rek regarding Harley's quotation and choice of cladding.pdf(1.39 MB) SEA00008812_Email Chain Between Glennon, Sheaf, Snowdon, Rek, Sounes regarding elevation drawings, windows, integrated vent, u-value, kitchen extract, embedding drawings of Window Vents, uncod.pdf(1.38 MB) SEA00008833_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics.pdf(421.74 KB) SEA00008837_Email Chain Between Sounes, Booth, Maddison, Gibson, Williams, Studio E, Lim, Smith, Campbell regarding meeting with Harley in relation to the curtain wall, estimates for the same,.pdf(1.05 MB) SEA00008858_Email Chain Between Rek, Smith, Sounes, Glennon, Campbell regarding kitchen extract fans.pdf(916.08 KB) SEA00008862_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics, secondary exit from boxing club.pdf(1.31 MB) SEA00008864_FW_ Matthew Wigan (Grenfell landscape).pdf(539.53 KB) SEA00008951_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics, secondary exit from boxing club.pdf(1.78 MB) SEA00008957_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics, secondary exit from boxing club.pdf(1.9 MB) SEA00008961_Email From Rek to Colt Group, Sounes, Glennon regarding smoke ventilation system queries and compatibility with windows, embedding drawings of Windows and Smoke Ventilators, uncode.pdf(422.3 KB) SEA00008970_Grenfell Update.pdf(299.52 KB) SEA00008985_Email from Sounes to Harris and Bailey regarding cladding options and requesting costings.pdf(333.9 KB) SEA00008990_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics, secondary exit from boxing club.pdf(1.34 MB) SEA00008992_Email Chain Between Glennon, Sheaf, Snowdon, Rek, Sounes regarding elevation drawings, windows, integrated vent, u-value, kitchen extract, roller shutter, embedding drawings of Win.pdf(1.66 MB) SEA00009012_Email Chain Between Glennon, Smith, Campbell, Studio E regarding insulation and thermal bridging.pdf(641.96 KB) SEA00009017_RE_ Grenfell Tower.pdf(433.5 KB) SEA00009019_Email Chain Between Cousins (Sig), Rek, Thompson (Sig), Sounes, Glennon, regarding cladding options of Proteus HR Panel, NedZink Nova composite, Nedzink Interlocking Panel.pdf(938.74 KB) SEA00009033_Email from Sounes to Ashton, Studio E, Smith, Campbell attaching draft fire strategy and fire access drawing, comment on reduction in AOV size.pdf(205.4 KB) SEA00009091_6075 Grenfell Tower S106 letter_1.0.pdf(42.74 KB) SEA00009142_Email Chain Between Sounes, Williams, Gibson attaching drawing showing smoke vented lobby.pdf(189.14 KB) SEA00009145_RE_ Kensington Grenfell Tower Landscape Fee Proposal.pdf(527.17 KB) SEA00009175_Progress update on tender documentation.pdf(386.95 KB) SEA00009184_RE_ Kensington Grenfell Tower Landscape Fee Proposal.pdf(479.05 KB) SEA00009194_RE_ Kensington Grenfell Tower Landscape Fee Proposal.pdf(686.76 KB) SEA00009210_Email Chain Between Smith, Sounes, Glennon, Studio E regarding Dry Riser Detail.pdf(480.97 KB) SEA00009220_RE_ Kensington Grenfell Tower Landscape Fee Proposal.pdf(966.61 KB) SEA00009222_Grenfell - Instruction to proceed..pdf(360.25 KB) SEA00009228_Re_ Progress update on tender documentation.pdf(1.47 MB) SEA00009229_Email from Harris to Sounes, Bailey attaching budget spreadsheet for reynobond natural zinc, ACM, different fixings.pdf(574.04 KB) SEA00009240_Email Chain Between Cousins (Sig), Rek, Thompson (Sig), Sounes, Glennon, regarding cladding options of Proteus HR Panel, NedZink Nova composite, Nedzink Interlocking Panel.pdf(1.88 MB) SEA00009242_Email Chain Between Sounes, Ashton, Strazzullo, Smith, Campbell, Ashton, Studio E, Marshall attaching plan for offices, retention of existing escape stair, exit route via lobby.pdf(536.47 KB) SEA00009342_Email Chain Between Glennon, Sheaf, Snowdon, Rek, Sounes regarding windows, smoke vents, roller shutters, doors.pdf(3.83 MB) SEA00009350_1279 Grenfell Tower - Risk register.pdf(260.62 KB) SEA00009355_Grenfell Tower Studio E contract.pdf(1.34 MB) SEA00009356_Curtins contract.pdf(559.63 KB) SEA00009398_Email from Sounes to Ashton, Campbell, Smith, Studio E regarding fire strategy queries including sprinkler system, vent system, AOV locations.pdf(433.44 KB) SEA00009414_Email Between Rek, Sig, Studio E regarding cladding options and samples, preference for fixed panels for stability reasons.pdf(624.95 KB) SEA00009421_FW_ Grenfell Tower Studio E contract.pdf(1.46 MB) SEA00009429_Email Chain Between Glennon, Pollard (Hydro), Rek, Sounes regarding windows and extraction fans.pdf(620.37 KB) SEA00009435_Email Between Rek, Sig, Studio E, Sounes, Glennon, Harris regarding cladding options and samples, preference for fixed panels for stability reasons.pdf(855.83 KB) SEA00009437_Email Between Rek, Walker (Sig), Studio E, Sounes, Glennon, Harris, Irving, Cousins regarding cladding options and samples, preference for fixed panels for stability reasons, budge.pdf(1.21 MB) SEA00009455_Email Chain Between Rek, Sounes, Glennon, Cohen attaching alternative plan for the crown.pdf(275.81 KB) SEA00009482_Email Chain Between Sounes, Campbell, Smith, Williams, Studio E, Booth, Lim regarding possible savings by not undertaking cladding on plant room at top of savings, embedding a draw.pdf(570.55 KB) SEA00009494_Email Chain Between Sounes, Campbell, Smith, Ashton, Studio E regarding ventilation system, embedding a drawing of a Ventilation System, uncoded..pdf(547.73 KB) SEA00009500_Email from Sounes to Campbell, Smith, Studio E attaching ventilated lobbies diagram.pdf(118.88 KB) SEA00009502_Email Chain Between Sounes, Campbell, Smith, Ashton, Studio E, Williams, Booth regarding ventilation system, embedding a drawing of a ventilation system, uncoded..pdf(612.13 KB) SEA00009561_Email from Ashton to Booth, Sounes, Lim, Strazzullo, Smith, Campbell, Blythe attaching structural specification drawings.pdf(352.15 KB) SEA00009736_Email from Harris to Rek, Bailey, Albiston, Sounes, Harris providing cladding KME Proteus M2 rate.pdf(526.36 KB) SEA00009757_Email Chain Between Campbell, Hanson, Smith, Ashton, Studio E, Sounes regarding smoke extract system, embedding drawing of a Smoke Exhaust, uncoded..pdf(1.06 MB) SEA00009764_Email Chain Between Harris, Rek, Bailey, Albiston, Sounes regarding cladding costs and fixings.pdf(1008.79 KB) SEA00009776_Email Chain Between Harris, Rek, Bailey, Albiston, Sounes regarding cladding costs and fixings.pdf(1.06 MB) SEA00009783_RE_ Grenfell Tower Studio E contract.pdf(1.63 MB) SEA00009805_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell regarding fire strategy, building regulations, smoke extract system.pdf(1.16 MB) SEA00009808_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell regarding fire strategy, building regulations, smoke extract system.pdf(1.81 MB) SEA00009809_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell regarding fire strategy, building regulations, smoke extract system.pdf(1.96 MB) SEA00009814_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell regarding fire strategy, building regulations, smoke extract system.pdf(2.35 MB) SEA00009815_Email Chain Between Pollard, Rek, Glennon, Sounes regarding specifications for windows and curtain walling.pdf(458.54 KB) SEA00009820_RE_ Grenfell Tower Studio E contract.pdf(1.94 MB) SEA00009821_1279-B2-002.pdf(486.96 KB) SEA00009822_Studio E Document Entitled _Standard Conditions of Appointment for an Architect Amendment 1 - 1 October 2011_ amending contract between TMO and Studio E.pdf(130 KB) SEA00009823_Document Entitled _Project Data 2010_ forming part of the contract between TMO and Studio E.pdf(1.09 MB) SEA00009824_Document Entitled _Services 2010_ forming part of the contract between TMO and Studio E.pdf(914.55 KB) SEA00009825_Document Entitled _Fees and Expenses Schedule 2010_ forming part of the contract between TMO and Studio E.pdf(659.41 KB) SEA00009826_Document Entitled _Appendix_D-Project_Brief.docx_ forming part of contract between Studio E and TMO.pdf(360.79 KB) SEA00009828_Asbestos and Toxic Mould Exclusion.doc.pdf(27.28 KB) SEA00009829_Document Entitled _CIC Novation Agreement_ - Pro Forma.pdf(704.38 KB) SEA00009830_Document Entitled _Memorandum of Agreement for the Appointment of An Architect_.pdf(1.62 MB) SEA00009876_Email Chain Between Sounes, Specialised Panels, Rek, Glennon regarding specifications and fire rating for birch plywood.pdf(890.31 KB) SEA00009905_Document Entitled _Appendix 3 Part 2 Design Sub-Contractor Warranty_ - pro forma.pdf(82.59 KB) SEA00009906_Studio E Architects Limited document Entitled _Appendix D - Standard Form of Novation Agreement.pdf_ - pro forma.pdf(32.43 KB) SEA00009931_Email Chain Between Glennon, Pollard (Hydro), Rek, Sounes regarding windows, extraction fans, aluminium curtain wall.pdf(5.13 MB) SEA00009958_FW_ Grenfell Tower Studio E contract.pdf(2.08 MB) SEA00009993_RE_ Grenfell Tower Studio E contract.pdf(2.26 MB) SEA00009997_Email Chain Between Rek, Walker, Sounes, Glennon, Harris regarding cladding options, costings, fixings.pdf(1.28 MB) SEA00010000_Email Chain Between Rek, Walker, Sounes, Glennon, Harris, Albiston, Bailey regarding cladding options, costings, fixings.pdf(1.43 MB) SEA00010076_Email from Glennon to Wigan, Studio E, Sounes attaching boundary drawing.pdf(372.42 KB) SEA00010081_Grenfell Tower tender has been issued.pdf(375.15 KB) SEA00010083_Document Entitled _Invitation to Tender Letter_.pdf(556 KB) SEA00010100_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell regarding fire strategy, drawings, smoke exhaust system, final exit route.pdf(737.73 KB) SEA00010102_Grenfell Bidder's Conference 5th December.pdf(581.49 KB) SEA00010108_RE_ 1279 Grenfell - Contract Boundary.pdf(880.37 KB) SEA00010124_Powerpoint Entitled _Grenfell Tower Bidder's Conference 5 December_SEA.pptx_ with drawings and photographs, embedding drawings of design renders, uncoded..pdf(5.74 MB) SEA00010128_Grenfell Invoice Ap 10.pdf(1.59 MB) SEA00010130_Re_ 1279 Grenfell - Contract Boundary.pdf(66.67 KB) SEA00010133_Email Chain Between Blythe, Williams, Sounes, Smith, Booth, Jackson regarding Questions from Bidder's Conference.pdf(504.61 KB) SEA00010134_Email Chain Between Blythe, Williams, Sounes, Smith, Booth, Jackson regarding Questions from Bidder's Conference.pdf(1.03 MB) SEA00010135_Email Chain Between Blythe, Williams, Sounes, Smith, Booth, Jackson regarding Questions from Bidder's Conference and attaching images.pdf(881.78 KB) SEA00010144_Email Chain Between Blythe, Williams, Sounes, Smith, Booth, Jackson regarding Questions from Bidder's Conference.pdf(900.86 KB) SEA00010147_Email Chain Between Harris, Sounes, Rek, Albiston, Bailey regarding window and curtain walling suppliers.pdf(454.08 KB) SEA00010148_Email Chain Between Harris, Sounes, Rek, Albiston, Bailey regarding window and curtain walling suppliers.pdf(626.72 KB) SEA00010149_Email Chain Between Harris, Sounes, Rek, Albiston, Bailey regarding window and curtain walling suppliers.pdf(664.15 KB) SEA00010152_Email Chain Between Harris, Sounes, Rek, Albiston, Bailey, Davies, Williams, Blythe, Studio E, Booth regarding window and curtain walling suppliers.pdf(903.42 KB) SEA00010155_Email Chain Between Blythe, Smith, Campbell, Sounes, Ashton, Booth, Williams, Chweechen regarding Peter Maddison's request for value engineering options.pdf(579.63 KB) SEA00010156_Email Chain Between Blythe, Smith, Campbell, Sounes, Ashton, Booth, Williams, Chweechen regarding Peter Maddison's request for value engineering options.pdf(1.35 MB) SEA00010171_Email Chain Between Blythe, Smith, Campbell, Sounes, Ashton, Booth, Williams, Chweechen regarding Peter Maddison's request for value engineering options.pdf(1.58 MB) SEA00010172_Studio E Spreadsheet regarding Grenfell Tower Value Engineering Options.pdf(13.03 KB) SEA00010178_Email Chain Between Blythe, Smith, Campbell, Sounes, Ashton, Booth, Williams, Chweechen, Strazzullo regarding Peter Maddison's request for value engineering options.pdf(1.83 MB) SEA00010201_Correspondence between KCTMO, Max Fordham and Studio E regarding Value Engineering Options for Grenfell Tower Regeneration Project.pdf(300.73 KB) SEA00010205_Email Chain Between Blythe, Williams, Sounes, Smith, Booth Regarding Value Engineering.pdf(743.98 KB) SEA00010208_Email Chain Between Blythe, Williams, Sounes, Smith, Booth Regarding Value Engineering.pdf(824.28 KB) SEA00010220_Email Chain Between Blythe, Williams, Sounes, Smith, Booth Regarding Value Engineering.pdf(430.67 KB) SEA00010221_Email Chain Between Williams, Sounes, Strazzullo, Blythe, Booth regarding items discussed at meeting on Monday 16 December 2013.pdf(514.52 KB) SEA00010231_happy new year.pdf(411.19 KB) SEA00010232_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell, Hoban regarding fire strategy, building regulations, smoke extract system, fire curtain, fire escape route, embedding a.pdf(2.8 MB) SEA00010236_after 6 Jan 2014.pdf(436.39 KB) SEA00010237_RE_ happy new year.pdf(274.43 KB) SEA00010239_RE_ happy new year.pdf(41.77 KB) SEA00010240_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell, Hoban, Smith, Studio E, Williams, Booth regarding fire strategy, building regulations, smoke extract system, fire curta.pdf(3.22 MB) SEA00010263_Email Chain Between Blythe, Williams, Sounes, Smith, Booth Regarding Value Engineering.pdf(555.41 KB) SEA00010267_Email Chain Between Blythe, Williams, Sounes, Smith, Booth Regarding Value Engineering.pdf(840.78 KB) SEA00010274_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell, Hoban regarding fire strategy, drawings, smoke exhaust system, final exit route, embedding a drawing of a Fire Exhaust.pdf(3.5 MB) SEA00010275_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell, Hoban, Booth, Smith, Williams regarding fire strategy, drawings, smoke exhaust system, final exit route, embedding a dr.pdf(3.73 MB) SEA00010301__FW_ RBKC PP_12_04097 Grenfell Tower, Grenfell Road, LONDON, W11 1TH__1.pdf(568.19 KB) SEA00010304_Email Chain Between Wray, Williams, Sounes, Smith, Booth regarding meeting Carl Stokes.pdf(801.12 KB) SEA00010327_Correspondence between Artelia, Max Fordham, KCTMO and Studio E attaching tender queries for Grenfell Tower project.pdf(369.79 KB) SEA00010333_FW_ Grenfell Tower Refurbishment Project - Studio E appointment.pdf(981.2 KB) SEA00010369_Studio E Document Entitled _Building Control Memo of 6 Dec 2013.docx_ from Allen to Hanson regarding ventilation system, riser access, refuse chutes.pdf(47.74 KB) SEA00010370_Correspondence between Artelia, KCTMO, Max Fordham And Studio E attaching tender queries, discussion of pricing of doorsets and cladding at Grenfell Tower.pdf(780.53 KB) SEA00010372_Email Chain Between Campbell, Booth, Sounes, Ashton, Williams, Smith, Blythe, Studio E regarding lobby smoke venting.pdf(1.07 MB) SEA00010379_Email Chain Between Campbell, Booth, Sounes, Ashton, Williams, Smith, Blythe, Studio E regarding lobby smoke venting.pdf(1.08 MB) SEA00010380_Correspondence between Artelia, KCTMO, Max Fordham And Studio E attaching tender queries for Grenfell Tower and attaching drawings and Studio E drawing register.pdf(522.36 KB) SEA00010388_Correspondence between Artelia, KCTMO, Max Fordham And Studio E attaching tender queries in relation to Grenfell Tower.pdf(273.22 KB) SEA00010406_Correspondence between Artelia, KCTMO, Max Fordham And Studio E attaching tender queries in relation to Grenfell Tower project.pdf(883.48 KB) SEA00010408_Fw_ Grenfell Tower - smoke extract.pdf(599.92 KB) SEA00010410_Correspondence between Artelia, KCTMO, Max Fordham And Studio E attaching tender queries at Grenfell Tower.pdf(108.62 KB) SEA00010436_Studio E Notebook Extract.pdf(120.66 KB) SEA00010445_Email Chain Between Sounes, Blythe, Williams, Smith, Campbell, Booth regarding tender queries.pdf(231.84 KB) SEA00010451_Email Chain Between Wray, Williams, Sounes, Smith regarding fire risk assessments for finger blocks and fire action plan.pdf(785.83 KB) SEA00010457_Email Chain Between Stokes, Williams, Wray, Sounes, Smith regarding flat entrance doors, fire risk assessment, fire alarm system, ventilation system.pdf(1.2 MB) SEA00010462_Correspondence between Artelia, KCTMO, Max Fordham And Studio E attaching tender queries and attaching drawings of Grenfell Tower.pdf(493.8 KB) SEA00010468_Email from Glennon to Stokes attaching fire drawings and plans.pdf(261.13 KB) SEA00010498_Studio E Notebook Extract.pdf(60.62 KB) SEA00010500_Email Chain Between Sounes, Williams, Blythe regarding fire doors.pdf(428.99 KB) SEA00010504_Email Chain Between Haselton, Blythe, Gardner, Baldwin, Smith, Sounes, Williams, Booth regarding queries re m&e specification and drawings.pdf(4.68 MB) SEA00010533_Email Chain Between Campbell, Booth, Sounes, Ashton, Williams, Smith, Blythe, Studio E regarding lobby smoke venting.pdf(1.41 MB) SEA00010558_Studio E Notebook Extract of meeting emebedding hand drawing of elevation.pdf(47.46 KB) SEA00010559_Grenfell and smoke vent lobbies - fire brigade session.pdf(472.18 KB) SEA00010575_Email Chain Between Blythe, Sounes, Smith, Campbell, Strazzullo, Williams, Booth, Lim, Jackson re Grenfell Tower Tender Returns.pdf(548.87 KB) SEA00010581_Email Chain Between Lim, Sounes, Campbell, Smith, Strazzullo attaching tender qualifications and alternative costs, comments on the same.pdf(295.2 KB) SEA00010582_Studio E Spreadsheet Entitled _11833 Grenfell Tender Qualifications.xlsx_.pdf(1.44 MB) SEA00010583_Artelia Spreadsheet Entitled _Cost for Alternative Design Solutions_ discussing potential cost savings for the provision of aluminium cladding, heating, gas, ventilation, windows.pdf(396.4 KB) SEA00010586_Email Chain Between Lim, Sounes, Campbell, Smith, Strazzullo attaching tender qualifications and alternative costs, comments on the same.pdf(537.35 KB) SEA00010630_Email Chain Between Blythe, Sounes, Booth regarding scoring of tenders and Rydon's performance.pdf(2.16 MB) SEA00010631_Spreadsheet Entitled _Grenfell Tender Evaluation Spreadsheet.xlsx_.pdf(2.08 MB) SEA00010633_Email Chain Between Campbell, Booth, Sounes, Ashton, Williams, Smith, Blythe, Studio E regarding lobby smoke venting.pdf(1.81 MB) SEA00010637_Email Chain Between Williams, Sounes, Smith, Ashton regarding smoke venting system, fire strategy drawings.pdf(1.84 MB) SEA00010645_Email Chain Between Williams, Wray, Stokes, Sounes regarding smoke strategy, smoke vents, lifts, fire risk assessments.pdf(298.86 KB) SEA00010646_Email Chain Between Sounes and Williams regarding office location and implications for fire strategy.pdf(707.96 KB) SEA00010649_Studio E Photograph Entitled “IMG_1488.JPG_.pdf(511.52 KB) SEA00010651_Email Chain Between Williams, Wray, Stokes, Sounes, Smith regarding smoke strategy, smoke vents, lifts, fire risk assessments, alarms, risers, fire doors, access by fire fighters,.pdf(1.84 MB) SEA00010652_Email Chain Between Williams, Wray, Stokes, Sounes, Smith regarding smoke strategy, smoke vents, lifts, fire risk assessments, alarms, risers, fire doors, access by fire fighters,.pdf(2.23 MB) SEA00010653_Email Chain Between Williams, Wray, Stokes, Sounes, Smith regarding smoke strategy, smoke vents, lifts, fire risk assessments, alarms, risers, fire doors, access by fire fighters,.pdf(2.32 MB) SEA00010654_Email Chain Between Williams, Wray, Stokes, Sounes, Smith, Ashton regarding smoke strategy, smoke vents, lifts, fire risk assessments, alarms, risers, fire doors, access by fire fi.pdf(1.9 MB) SEA00010657_Email Chain Between Williams, Wray, Stokes, Sounes, Smith, Ashton, Campbell regarding smoke strategy, smoke vents, lifts, fire risk assessments, alarms, risers, fire doors, access.pdf(2.79 MB) SEA00010660_Email Chain Between Williams, Wray, Stokes, Sounes, Smith, Ashton, Campbell regarding smoke strategy, smoke vents, lifts, fire risk assessments, alarms, risers, fire doors, access.pdf(3.52 MB) SEA00010663_Email Chain Between Blythe, Sounes, Smith, Campbell, Strazzullo, Williams, Jackson regarding Rydon being the preferred bidder.pdf(551.43 KB) SEA00010664_Email Chain Between Blythe, Sounes, Smith, Campbell, Strazzullo, Williams, Jackson, Kuszell, Glennon, Kiefer, Crawford regarding Rydon being the preferred bidder.pdf(823.6 KB) SEA00010665_RE_ Grenfell.pdf(283.62 KB) SEA00010666_RE_ Grenfell.pdf(669.25 KB) SEA00010667_Grenfell Tower.pdf(332.89 KB) SEA00010669_Grenfell tower - Rydon Construction.pdf(262.87 KB) SEA00010678_Email Chain Between Williams, Smith Sounes regarding venting system.pdf(432.28 KB) SEA00010679_RE_ Grenfell.pdf(974.47 KB) SEA00010680_Email Chain Between Williams, Smith, Sounes, Campbell regarding venting system.pdf(358.44 KB) SEA00010698_Email Chain Between Booth, Watterson, Lawrence, Williams, Blythe, Sounes regarding Rydon proposals for aluminium cladding, removal of crown, removal of louvre panel.pdf(18.31 KB) SEA00010699_Grenfell fire strategy.pdf(458.38 KB) SEA00010706_Email Chain Between Williams, Sounes regarding fire strategy drawings.pdf(665.67 KB) SEA00010712_Email Chain Between Williams, Sounes regarding fire strategy drawings.pdf(720.15 KB) SEA00010713_Grenfell Tower.pdf(329.87 KB) SEA00010715_Email Chain Between Williams, Sounes regarding fire strategy drawings.pdf(1.24 MB) SEA00010720_Email Chain Between Booth, Watterson, Lawrence, Williams, Blythe, Sounes regarding Rydon proposals for aluminium cladding, removal of crown, removal of louvre panel.pdf(1.16 MB) SEA00010749_Email Between Lawrence and Sounes attaching schedule of services.pdf(312.32 KB) SEA00010750_Studio E Architects Limited subject entitled _Grenfell Tower Project on behalf of KCTMO_.pdf(152.65 KB) SEA00010755_Email Between Lawrence and Sounes regarding Harley sourcing of rainscreen cladding samples_material.pdf(785.1 KB) SEA00010761_Correspondence between KCTMO, Rydon, IBI Group, Artelia and Studio E attaching minutes of the pre-contract meeting held on 09_04_14.pdf(531.67 KB) SEA00010775_Email Between Lawrence, Sounes, Fabiunke, Harris regarding Harley sourcing of rainscreen cladding samples_material and costings.pdf(1.53 MB) SEA00010778_FW_ Grenfell Tower - Additional Samples.pdf(504.56 KB) SEA00010779_Email Between Fabiunke, Harris, Lawrence, Sounes attaching images of desired ACM Rainscreen Cladding and discussing fixings.pdf(623.5 KB) SEA00010782_Correspondence between Harley and Studio E attaching hand drawing of fixings.pdf(228.89 KB) SEA00010785_Correspondence between Studio E, Rydon and Harley attaching images of desired ACM Rainscreen Cladding and discussing fixings.pdf(828.34 KB) SEA00010786_Grenfell - Planning info.pdf(333.44 KB) SEA00010790_RE_ grenfell - meeting planners.pdf(689.55 KB) SEA00010804_Studio E Photograph Entitled “IMG_1048_ showing cladding samples.pdf(342.43 KB) SEA00010817_Studio E Photograph Entitled “IMG_1061.JPG_ showing cladding samples.pdf(362.93 KB) SEA00010820_Correspondence between Studio E, Rydon and KCTMO regarding meeting times and attaching ACM Cladding sample.pdf(145.44 KB) SEA00010826_RE_ Grenfell Friday Meeting.pdf(568.57 KB) SEA00010889_Correspondence within Studio E regarding cladding and insulation specifications.pdf(10.81 KB) SEA00010900_Email from Fabiunke to Sounes attaching Images for Planners.pdf(251.8 KB) SEA00010905_Studio E, drawing entitled Option1-18, uncoded showing proposed cladding, window, infill panel and sandwich panels.pdf(155.91 KB) SEA00010906_Correspondence between IBI Group, Artelia and Studio E regarding change in cladding and impact on cost and maintenance.pdf(428.07 KB) SEA00010912_Studio E, drawings entitled 140508 Grenfell Tower, uncoded..pdf(2.5 MB) SEA00010913_Correspondence between Studio E, Silver Dcc and Rydon regarding Planning meeting 8 May 14, cladding fixings, crown, cladding samples, louvres.pdf(518.29 KB) SEA00010942_Artelia Document Entitled _RBKC Planners Meeting Minutes 8 May 14.docx_ regarding materials used for the Facade works at GT.pdf(1.14 MB) SEA00010953_Correspondence between KCTMO, Artelia, Rydon, IBI Group, Studio E regaridng minutes from planner meeting 08_05_14 and comments on service life of zinc and ACM.pdf(1.34 MB) SEA00010959_Correspondence between RBKC, IBI Group, Artelia Group, KCTMO and Studio E regarding planners meeting 08_05_14, planners' concerns about ACM cladding.pdf(784.15 KB) SEA00010964_Correspondence between RBKC, IBI Group, Artelia Group, KCTMO and Studio E regarding planners meeting 08_05_14, planners' concerns about ACM cladding, embedding a drawing of claddin.pdf(1.47 MB) SEA00010993_Correspondence between Studio E, Rydon, Harley, Alcoa and CEP regarding samples of cladding and choice of colour of panels for Grenfell Tower facade works.pdf(984.95 KB) SEA00010994_Correspondence between Studio E, Rydon, Harley, Alcoa and CEP regarding samples of cladding and choice of colour of panels for Grenfell Tower facade works.pdf(1.37 MB) SEA00011032_Correspondence between Studio E, KCTMO, Rydon, IBI Group and Harley commenting on brushed aluminium cladding and fixings for Grenfell Tower.pdf(588.62 KB) SEA00011053_Correspondence between Studio E and Rydon regarding value engineering suggestions about Grenfell Tower refurbishment works.pdf(423.82 KB) SEA00011069_Correspondence between Artelia Group, Studio E, KCTMO regarding Reynobond natural brushed aluminium being first choice, fixings of the same.pdf(1.26 MB) SEA00011087_Correspondence between Studio E, KCTMO, RBKC, Artelia Group and Rydon regarding change of use from office to residential, planners' concerns over cladding, fixings for Grenfell Tow.pdf(1.92 MB) SEA00011095_Grenfell.pdf(118.9 KB) SEA00011100_Correspondence between Alcoa, Harley, CEP, Rydon, Studio E regarding samples of cladding, colour preference, orientation of panels.pdf(2.35 MB) SEA00011101_Correspondence between Harley, Studio E and Rydon regarding samples of cladding, colour preference, orientation of panels and attaching drawings.pdf(2.54 MB) SEA00011103_Email Chain Between Sounes, Williams, Watterson, Lawrence regarding change of use planning application and drawings.pdf(193.94 KB) SEA00011127_Correspondence between Studio E, Harley and Rydon regarding Grenfell Tower ACM Sample Mock up attaching drawing showing ACM panels and fixing, embedding drawing of Cladding, uncode.pdf(761.63 KB) SEA00011156_Correspondence between Studio E, Rydon and Harley regarding cladding fixing drawing in relation to Grenfell Tower refurbishment works.pdf(433.74 KB) SEA00011192_Correspondence between Studio E and IBI Group regarding detail elevation drawings and cost savings in relation to Grenfell Tower refurbishment works.pdf(1.97 MB) SEA00011261_Correspondence between KCTMO, IBI Group, Rydon and Studio E regarding planning condition application relating to materials used for Grenfell Tower.pdf(670.96 KB) SEA00011265_Correspondence between Studio E, Rydon and IBI Group regarding materials to be used for Grenfell Tower.pdf(1.25 MB) SEA00011271_Design team meeting.pdf(322.02 KB) SEA00011298_Grenfell - Mock-up.pdf(354.83 KB) SEA00011305_Studio E Photograph Entitled “IMG_2134.JPG_.pdf(379.31 KB) SEA00011307_Studio E Photograph Entitled “IMG_2136.JPG_.pdf(494.95 KB) SEA00011308_Studio E Photograph Entitled “IMG_2137.JPG_.pdf(550.46 KB) SEA00011309_Studio E Photograph Entitled “IMG_2138.JPG_.pdf(400.92 KB) SEA00011310_Studio E Photograph Entitled “IMG_2139.JPG_.pdf(540.39 KB) SEA00011320_Correspondence between Cllr Feilding-Mellen (RBKC) and Studio E regarding cladding at Grenfell Tower and discussing about the fixing of the same.pdf(835.15 KB) SEA00011321_Correspondence between Cllr Feilding-Mellen (RBKC) and Studio E regarding cladding at Grenfell Tower and discussing about the fixing of the same.pdf(1.02 MB) SEA00011344_Correspondence between IBI Group, Studio E and RBKC regarding planning application for Grenfell Tower, visible fixings not being acceptable, planners' preference for champagne pane.pdf(1.21 MB) SEA00011348_FW_ Grenfel Tower - Building Control Fees.pdf(454.01 KB) SEA00011352_Correspondence between RBKC, Studio E and KCTMO regarding photographs of proposed cladding, discussion re colour and fixings in relation to Grenfell Tower.pdf(2.09 MB) SEA00011354_Email Chain Between Sounes, Maddison, Gibson, Williams, Watterson attaching drawings of champagne cladding.pdf(323.35 KB) SEA00011356_RE_ Grenfel Tower - Building Control Fees.pdf(663.34 KB) SEA00011358_Email Chain Between Sounes, Maddison, Gibson, Williams, Watterson attaching drawings of champagne cladding.pdf(412.1 KB) SEA00011359_Correspondence between IBI Group, Artelia Group, KCTMO, Studio E and RBKC regarding planning application for Grenfell Tower, visible fixings not being acceptable, planners' prefere.pdf(2.24 MB) SEA00011362_Correspondence between Studio E, Harley and BCM GRC Limited providing details on BCM GRC cladding in relation to Grenfell Tower.pdf(337.22 KB) SEA00011371_Correspondence between KCTMO and Studio E attaching updating Grenfell drawings re cladding.pdf(788.47 KB) SEA00011373_Correspondence between IBI Group, Artelia Group, KCTMO, Studio E and RBKC regarding planning application for Grenfell Tower, visible fixings not being acceptable, planners' prefere.pdf(1.83 MB) SEA00011390_Correspondence between Studio E, Harley and BCM GRC Limited providing details on BCM GRC cladding and fixings option in relation to Grenfell Tower.pdf(948.56 KB) SEA00011395_RE_ Grenfell Tower - Building Control Fees.pdf(460.38 KB) SEA00011397_Correspondence between Studio E and KCTMO regarding drawings of champagne cladding and GRC in relation to the Grenfell Tower refurbishment works.pdf(1.16 MB) SEA00011400_Correspondence between Studio E, KCTMO and RBKC regarding photographs of proposed cladding for Grenfell Tower, discussion re colour and fixings, attaching drawings of options.pdf(3.22 MB) SEA00011401_Correspondence between Studio E, KCTMO and RBKC regarding photographs of proposed cladding for Grenfell Tower, discussion re colour and fixings, attaching drawings of options.pdf(3.64 MB) SEA00011403_Correspondence between KCTMO and RBKC regarding Cllr Maddison(RBKC)'s approval of champagne colour cladding and cassette fixings.pdf(313.11 KB) SEA00011404_Correspondence between Studio E, RBKC and IBI Group regarding an update on materials to champagne cladding, concealed fixings, GRC at ground floor in relation to Grenfell Tower.pdf(447.45 KB) SEA00011423_FW_ Grenfell Tower Section 106.pdf(2.02 MB) SEA00011437_FW_ Grenfell Tower Section 106.pdf(1 MB) SEA00011438_Grenfell Tower - CTMP.pdf(273.19 KB) SEA00011439_Email Chain Between Mortimer, Gibson, Keane, Williams, Johnson, Scannell, Watterson, Sounes, Blythe, Lawrence regarding change of use planning application, impact on fire exits and.pdf(1.53 MB) SEA00011443_Email Chain Between Mortimer, Gibson, Keane, Williams, Johnson, Scannell, Watterson, Sounes, Blythe, Lawrence regarding change of use planning application, impact on fire exits and.pdf(2.43 MB) SEA00011475_Correspondence between Studio E, IBI Group and RBKC regarding cladding materials to be used in relation to Grenfell Tower.pdf(1.62 MB) SEA00011489_Grenfell Tower - Dry Riser.pdf(384.06 KB) SEA00011490_Email Between Lamb, Lawrence, Anketell-Jones, Crawford, Sounes attaching drawings.pdf(315.54 KB) SEA00011493_Email chain between JS Wright and Studio E concerning a query about dry risers with relevant plans and a means of escape observations memo attached.pdf(538.84 KB) SEA00011515_Correspondence between Harley, Rydon and Studio E regarding cladding panels and fixings in relation for Grenfell Tower.pdf(1.02 MB) SEA00011520_Correspondence between Harley, Rydon and Studio E regarding cladding panels and fixings in relation for Grenfell Tower.pdf(672.4 KB) SEA00011524_Email Chain Between North, Ekingen, O'Connor, Strazzullo, Ferenzena, Sounes, Crawford, Bradbury, Lawrence regarding flat layout and updated drawings.pdf(1.16 MB) SEA00011526_Grenfell - Design Team Meeting No.2.pdf(22.07 KB) SEA00011542_Email Chain Between Bradbury, Sounes, Crawford, O'Connor, McLaughlin regarding fire strategy approval and dry riser.pdf(34.17 KB) SEA00011569_Email Chain Between Bradbury, Hoban, McLaughlin, Thorne, Whyte, Lawrence, O'Connor, Crawford, Sounes, Hanson regarding dry riser modifications.pdf(1.09 MB) SEA00011594_FW_ Grenfell Tower - outstanding invoice no. 14-001.pdf(1.13 MB) SEA00011595_RE_ Grenfell Tower - outstanding invoice no. 14-001.pdf(1.44 MB) SEA00011609_URGENT Grenfell and planning submission - Design and Access Statement.pdf(416.69 KB) SEA00011645_RE_ URGENT Grenfell and planning submission - Design and Access Statement.pdf(655.28 KB) SEA00011729_Correspondence between KCTMO, Artelia Group, Rydon and Studio E regarding cladding colour in relation to Grenfell Tower.pdf(406.72 KB) SEA00011805_Correspondence between Harley, Rydon and Studio E attaching drawings for final approval, comments on the same with particular reference to cladding and windows at Grenfell Tower.pdf(621.97 KB) SEA00011955_Grenfell Design.pdf(480.01 KB) SEA00012012_Correspondence between RBKC, IBI Group, Artelia Group and Studio E regarding window size at Grenfell Tower.pdf(1.26 MB) SEA00012019_Correspondence between RBKC, IBI Group, Artelia Group and Studio E regarding window size at Grenfell Tower attaching drawings.pdf(1.61 MB) SEA00012030_Correspondence between KCTMO, Artelia Group, Rydon and Studio E regarding windows and HIU, impact on planning in relation to Grenfell Tower.pdf(1.75 MB) SEA00012035_Correspondence between IBI Group, Rydon and Studio E attaching reduced window design drawing showing comparison.pdf(402.47 KB) SEA00012037_Correspondence between Max Fordham, Rydon and Studio E regarding reduced window design drawing showing comparison.pdf(461.82 KB) SEA00012080_Email Chain Between Williams, Lawrence, Booth, Sounes, Crawford, Smith, O'Connor, Gibson, Valente regarding window size, insulation values, overheating, impact on planning applicat.pdf(1.46 MB) SEA00012099_Correspondence between Rydon, Studio E, Artelia Group and Max Fordham regarding window size, insulation values, overheating, impact on planning application.pdf(2.04 MB) SEA00012137_Correspondence between Rydon, Studio E, Artelia Group and Max Fordham regarding window size, insulation values, overheating, impact on planning application.pdf(2.18 MB) SEA00012176_Correspondence between Studio E, KCTMO and Ibi Group regarding application to alter window design for Grenfell Tower.pdf(2.25 MB) SEA00012179_Studio E Plan entitled “Reduced Window Opening Inward Opening Leafs_ 1279 SK 112 02.pdf(531.59 KB) SEA00012200_Email Chain Between Crawford, Hoban, Lawrence, Hanson, Ashton, O'Connor, Sounes regarding fire strategy drawings for lower levels, Exova strategy, extraction, riser access.pdf(2.88 MB) SEA00012325_Studio E drawing entitled “Proposed Floor Plans Canopy Studies_ 1279 SK 044 Stage C.pdf(666.93 KB) SEA00012326_Studio E Plan entitled “Tower Section Heating Diagrams_ 1279 SK 043 Rev 00 Stage C.pdf(486.32 KB) SEA00012332_Correspondence between KCTMO, Rydon and Studio E regarding window choice for Grenfell Tower.pdf(1.04 MB) SEA00012334_Studio E drawing entitled “Proposed South Elevation_ 1279 SK 042 Rev 00 Stage C.pdf(478.91 KB) SEA00012346_Correspondence between Studio E and Rydon regarding window design for Grenfell Tower.pdf(672.34 KB) SEA00012567_Correspondence between Rydon, Studio E and Harley attaching drawing of window and trickle vent, discussing restrictors and extract vents.pdf(384.01 KB) SEA00012573_Correspondence between Rydon, Studio E, Harley regarding window specification for Grenfell Tower.pdf(290.55 KB) SEA00012667_Email Chain Between Lamb, Lawrence, North, Crawford, Sounes, Stapley, Anketell-Jones, Maxwell, Bailey attaching sections drawings.pdf(458.71 KB) SEA00012758_Correspondence between Studio E, Rydon and harley attaching drawing of revised type 10 windows.pdf(287.02 KB) SEA00012761_Correspondence between Studio E and Harley asking for Studio E's officials to proceed with Grenfell refurbishments.pdf(438.5 KB) SEA00012850_Correspondence between Rydon, Studio E and Harley attaching drawings showing fire breaks on party walls.pdf(361.77 KB) SEA00012868_Email Chain Between Lamb, Lawrence, Crawford, Sounes, Anketell-Jones, Stapley, Maxwell, Bailey attaching sections drawings.pdf(453.15 KB) SEA00012906_Correspondence between Rydon, Studio E and Harley attaching drawings showing fire breaks on party walls.pdf(451.91 KB) SEA00012915_Correspondence between Rydon, Studio E and Harley concerning fire breaks at Grenfell.pdf(715.77 KB) SEA00012971_Email Chain Between Bushell, Maynard, Marriott, Williams, O'Connor, Lawrence, Gibson, Strazzullo, Smith, Sounes, Churchman, Reed, Valente, Lim, Crawford attaching Artelia health an.pdf(600.24 KB) SEA00012981_Correspondence between Studio E, Harley and Rydon attaching final window drawings sent for manufacture.pdf(344.5 KB) SEA00013001_Correspondence between Rydon, Studio E and Harley attaching updated firebreak drawings, updated to 120 minutes.pdf(326.41 KB) SEA00013014_Email Chain Between Bushell, Maynard, Marriott, Williams, O'Connor, Lawrence, Gibson, Strazzullo, Smith, Sounes, Churchman, Reed, Valente, Lim attaching Artelia health and safety f.pdf(438.78 KB) SEA00013026_Correspondence between Harley, Studio E and Rydon attaching updated firebreak drawings, updated to 120 minutes, comments on the same.pdf(344.98 KB) SEA00013101_Correspondence between Studio E, Harley and Rydon attaching window drawings, discussion re vents, trickle vents, extraction fan.pdf(416.24 KB) SEA00013508_1279-A11-Technical Review STAGE E-F.docx.pdf(2.08 MB) SEA00013878_Email chain attaching Studio E deed of appointment and collateral warranty.pdf(437.47 KB) SEA00013908_Email chain re Studio E warranties, liability cap.pdf(611.03 KB) SEA00013911_Email chain re Studio E warranties, liability cap.pdf(914.22 KB) SEA00013921_Correspondence between KCTMO and Studio E regarding roof and cladding progress works at Grenfell Tower with photograph.pdf(541.75 KB) SEA00013947_Email chain re Studio E warranties, liability cap.pdf(1.58 MB) SEA00014106_FW_ Grenfell Tower - KCTMO.pdf(1.32 MB) SEA00014115_Grenfell Tower - Landscape and Tower Completion Update.pdf(1.49 MB) SEA00014274_Exhibit BS_1 - Bruce Sounes (Studio E)_1.pdf(105.64 MB) SEA00014419_Studio E CPD Seminars List 2016.pdf(323.03 KB) SEA00014420_CPD Seminars List 2013.pdf(622.95 KB) SEA00014422_CPD Seminars List 2017.pdf(602.21 KB) SEA00014423_CPD Seminars List 2012.pdf(582.55 KB) SEA00014424_CPD Seminars List 2010.pdf(560.55 KB) SEA00014427_CPD Seminars List 2011.pdf(315.6 KB) ART00000148_Studio E- Project Fee Schedule detailing breakdown by month and stage.pdf(371.05 KB) ART00000168_Notes from Project Meeting No.5 held on Thursday 18 July 2012 at 14h00 at Appleyards.pdf(2 MB) ART00000981_Email regarding design costings.pdf(1.16 MB) ART00005742_Letter attaching RICS Standard Form of Consultant's Appointment Contract between TMO and Appleyards_Artelia with Fee Proposal and Employers Agent Services attached (signed).pdf(10.29 MB) BRE00005554_BRE and FRS Publication_ Fire performance of external thermal insulation for walls of multi-storey buildings, 2nd edition..pdf(7 MB) CEL00003364_BR 135 Third Edition - Fire performance of external thermal insulation for walls of multistory buildings..pdf(3.41 MB) CLG00000173_The Building Regulations 2010 (Fire Safety) Approved Document B Volume 2 (Buildings other than dwelling houses) 2006 edition incorporating 2007 & 2010 amendments (online version).pdf(122.94 MB) EXO00000474_Email Studio E to Exova re request for fee proposals.pdf(454.23 KB) EXO00000685_Emails between Exova and Studio E re fire consultancy fee proposal, initial comments on feasibility of design proposals and need for site visit®.pdf(1.75 MB) INQ00011326_RIBA CPD Article_ An Introduction to Specification Writing (https___www.ribacpd.com_articles_nbs_5340_an-introduction-to-specification-writing_200002_).pdf(3.57 MB) INQ00011339_NBS 2013-3 report images 23.pdf(134.87 KB) INQ00011365_NBS 2013-3 report images 26.pdf(277.73 KB) MAX00000008_Studio E Notes from Client Meeting held on 28 March 2012.pdf(996.77 KB) RYD00014215_Grenfell Tower Project Draft Schedule of Services.pdf(2.87 MB) RYD00064706_Email between Bruce Sounes (SE) and Simon Lawrence (RYD) attaching draft of schedule of services and corresponding response to same.pdf(414.59 KB) RYD00067046_Email attaching documents relating to the AOV and fire doors.pdf(321.42 KB) RYD00094228_Studio E deed of appointment dated 3 February 2016.pdf(5.4 MB) SEA00001691_Letter from CE Lifts to Studio E containing quote for CE Lifts to provide a glass hydraulic lift installation.pdf(3.86 MB) SEA00004324_Exova, drawing entitled Ground Floor, JW2958D, Issue 01.pdf(3.87 MB) SEA00004562_Letter to Mark Anderson from Bruce Sounes to clarify proposed fees and conditions of service for the refurbishment and recladding of GT.pdf(797.58 KB) SEA00004571_RIBA Standard Conditions of Appointment for a Consultant 2010 (specimen).pdf(981.05 KB) SEA00013741_Email attaching Grenfell fee schedule, warranty, deed of appointment (Studio E).pdf(1.02 MB) ART00008396_Exhibit AD_116 - Email from Studio E to AUK, TMO, Churchman LA, Max Fordham, Curtins, Exova, Syntegra Consulting and IBI Taylor Young dd. 31 October 2012.pdf(572.92 KB) EXO00000430_Exova Grenfell Tower Outline Fire Safety Strategy dated 24_10_2012 Attached to Studio E Fire Strategy sent to building control.pdf(4.12 MB) EXO00000518_M Treanor to Adrian Studio E re Issue 1 Fire Strategy.pdf(222.57 KB) EXO00000519_Exova Grenfell Tower Outline Fire Safety Strategy dated 31_10_2011.pdf(3.81 MB) EXO00000586_Email chain between Exova and Studio E re cavity barriers fire resistance.pdf(1.65 MB) EXO00000753_Minutes of Design Team meeting No. 5 held on 18 July 2012 between TMO, Leadbitter, Appleyards, Max Fordham, Curtins, Churchman and Studio E dated 24 July 2011 re Grenfell Tower Ref.pdf(2 MB) EXO00001279_Email Chain between C Cooney to A Martyn (Exova) and Studio E concering design and fire safety at Grenfell Tower with relevant drawings attached.pdf(659.92 KB) LBI00000620_fire safety.pdf(1.28 MB) MAX00000445_Grenfell Tower Stage C Report including Studio E drawings, 1279SK018 Rev 00, 1279SK019 Rev 00, 1279SK020 Rev 00, 1279SK021 Rev 00, 1279SK022 Rev 00, 1279SK004 Rev 00, 1279SK004 Rev.pdf(86.92 MB) MAX00000757_Studio E- Grenfell Tower Regeneration Project - Stage D Report.pdf(42.83 MB) SEA00006395_Studio E spreadsheet entitled Work Packages and regarding 1279 Grenfell Tower Project.pdf(379.13 KB) TMO10001143_Studio E Minutes of Design Team Meeting held on 19 April 2012.pdf(2.37 MB) TMO10001562_Exova Fire Safety Strategy for Grenfell Tower..pdf(2.12 MB) TMO10001925_Exova Draft Existing Fire Safety Strategy Grenfell Tower Regeneration Project.pdf(8.87 MB) CEL00000013_Celotex RS5000 guide.pdf(6.26 MB) EXO00001107_Exova Grenfell Tower Outline Fire Safety Strategy.pdf(4.26 MB) TMO00835763_Studio E RBKCTMO Rydon Deed of Collateral Warranty_0.pdf(374.88 KB) INQ00011220_Good practice in the selection of construction materials (1997).pdf(9.41 MB) CEP00048112_Emails between Studio E and CEP requesting opinion on cladding systems and rates for them._3.pdf(65.88 KB) HAR00005515_Email chain between Bruce Sounes and Mark Harris entitled Harley Envelope Budget regarding cladding costs_3.pdf(31.33 KB) HAR00005996_Email Chain Between Tomas Rek, Simon Walker (Sig), Bruce Sounes, Paddy Glennon, Mark Harris, Ray Bailey regarding choice of cladding and fixtures, budget_3.pdf(872.71 KB) HAR00010233_3455 - RE_ Grenfell Tower_3.pdf(803.36 KB) SEA00001334_Spreadsheet from Rockwool to Studio E regarding Rainscreen duoslab measurements_3.pdf(271.18 KB) SEA00003497_Photograph entitled _Ferrier Point 9 - progress shot with rainscreen cladding fitted.jpg__3.pdf(1002.46 KB) SEA00003516_Ferrier Point 10- mast climbers in action.jpg_3.pdf(561.67 KB) SEA00003943_CEP Plan from Stretford House Entitled _Typical Reveal Detail__3.pdf(37.31 KB) SEA00009237_Email Chain Between Harris, Sounes, Bailey attaching budget spreadsheet for reynobond natural zinc, ACM, different fixings, Nedzink pricing, concrete cladding_3.pdf(814.14 KB) SEA00014431_Bundle of Alucobond product literature_2.pdf(92.5 MB) SEA00014616_'Rheinzink' bundle of documents including product literature and handwritten notes_0.pdf(59.61 MB) SIG00000248_Proteus HR Honeycomb Metal Rainscreen product information_0.pdf(8.92 MB) TMO10003310_August 2013 1279 Stage D Report.®.pdf(40.31 MB) TMO10040925_TMO Document entitled _Artelia International Final Tender Report on Enhancements and Improvements to Grenfell Tower for RBKCTMO_ reporting on Grenfell Tower tenders..pdf(33.79 MB) EXO00000214_Email B Sounes (S E) to D Campbell M Smith (MaxF), T Ashton (Exova) re RBKC Building Control's comments.pdf(3.21 MB) EXO00000621_B Sounes to C Williams (TMO) cc M Smith, T Ashton (Exova) email attaching fire safety drawings with Building Control comments.pdf(733.1 KB) IBI00000048_Email re. progression of refurbishment works at Grenfell Tower.pdf(25.12 KB) RBK00000236_Engagement Statement.pdf(1.24 MB) RBK00000474_Minutes of Housing Digest Meeting held on 20 August 2012.pdf(195.51 KB) RYD00014379_Studio E, Full Plans Application, submission to RBKC.pdf(1.24 MB) RYD00026230_Studio E, drawing render of Proposed South Elevation, 1279_SK042 Rev 00.pdf(479.07 KB) SEA00002596_Studio E, drawing entitled Proposed South Elevation, 1279(05)100 Rev 00.pdf(1.9 MB) SEA00005449_Correspondence between Studio E and KCTMO regarding design images and superimposing zinc cladding for Grenfell Tower refurbishment works.pdf(948.22 KB) SEA00005947_Studio E, drawing entitled Undercroft Elevation, 1279PL010 Rev 00.pdf(201.45 KB) SEA00008836_Email Chain Between Sounes, Booth, Maddison, Gibson, Williams, Studio E, Lim, Smith, Campbell regarding meeting with Harley in relation to the curtain wall, estimates for the same,.pdf(1.01 MB) SEA00009510_Email Chain Between Sounes, Campbell, Smith, Williams, Studio E, Booth, Lim regarding possible savings by not undertaking cladding on plant room at top of savings, embedding a draw.pdf(954.95 KB) SEA00009628_Studio E specification document for tender entitled _1279 Grenfell Tower Draft_.pdf(6.64 MB) SEA00013512_Studio E Drawing Register and Issue Advice up to 06_07_15.pdf(3.44 MB) TMO10003944_Studio E - Risk Assessment Schedule 23 October 2013.pdf(622.56 KB)